Browse
Search
2018-819-E Planning - J W Wilkerson contract amendment Phase 2 Extension
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-819-E Planning - J W Wilkerson contract amendment Phase 2 Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 4:29:47 PM
Creation date
12/21/2018 4:42:28 PM
Metadata
Fields
Template:
Contract
Date
12/20/2018
Contract Document Type
Contract Amendment
Agenda Item
6/20/17
Amount
$149,449.09
Document Relationships
2017-279-E Planning - J.F. Wilkerson Contracting Co., Inc. - Notice of Award (Only) - Efland to Mebane Sewer, Phase 2 Extension
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2019-237-E Planning - JF Wilkerson Efland sewer contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-300-E Planning - J F Wilkerson contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-819 Planning - J W Wilkerson contract amendment Phase 2 Extension
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Change Proposal Form <br /> Project: Efland SS to Mebane Phase 2 <br /> Contract: 16.01904 <br /> Contractor: JF Wilkerson Contracting, Inc. <br /> Utility <br /> Construction Proposal No. 011 <br /> Project No. CIP 30044 <br /> Contractor No. C077 <br /> Description of Change: <br /> Additional Rock Excavation not included in Bid Quantity <br /> Item Qty Unit Unit Price Extended Price <br /> Rock Excavaion 4,080 CY $ 52.00 $ 212,160.00 <br /> Total Additional Rock Excavation $ 212,160.00 <br /> Time Extension Request 69 Days <br /> Time Extension Approved 35 Days <br /> The contractor agrees to perform the work outlined in thes change proposal for the amount specified above and in accordance with the <br /> Contract documents if the work is authorized by the Owner. <br /> Contractor Signature: Date 12/14/2018 <br /> �M1'H��I��!-YS�4L <br /> Approval Recommended by Engineer:-''- <br /> Y+" Date 12/14/2018 <br /> Owner Representative: f nr�'�v �i; <br /> x'. Date 12/17/2018 <br /> Approval Recommended: . - .: Date 12/14/2018 <br /> Over the course of the project significantly more rock was encountered than originally anticipated.Rock was not <br /> expected to be present along the force main however several hundred cubic yards were encountered,likewise <br /> quantities greatly exceeding expectations were found to be present at the pump station site and along the gravity <br /> section.The bid quantity included for this project allowed for 1,000 cubic yards of rock(Bid Item 48),approximately <br /> 5,080 cubic yards of rock has been or is expected to be encountered during construction.This quantity has been <br /> measured by the Contractor and verified by the Engineer to be both reasonable and accurate.The total projected <br /> cost increase of the rock overrun is estimated to be$212,160.00.To contend with this unforeseen rock quantity <br /> the Contractor has requested an additional 69-days,after reviewing this request the Engineer recommended a 35- <br /> day extension as the rock did not prevent work from progressing in other areas of the project as well as overlap <br /> with other requested days. <br /> CPR O11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.