Orange County NC Website
DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Change Proposal Form <br /> Project: Efland SS to Mebane Phase 2 <br /> Contract: 16.01904 <br /> Contractor: JF Wilkerson Contracting, Inc. <br /> Utility <br /> Construction Proposal No. 010 <br /> Project No. CIP 30044 <br /> Contractor No. C077 <br /> Description of Change: <br /> Additional Force Main not included in Bid Quantity <br /> Item Qty Unit Unit Price Extended Price <br /> 12" Dia PVC Force Main 1,278 LF $ 34.00 $ 43,452.00 <br /> Total Material and Labor for Depth Adjustments $ 43,452.00 <br /> Time Extension Request 18 Days <br /> The contractor agrees to perform the work outlined in thes change proposal for the amount specified above and in accordance with the <br /> Contract documents if the work is authorized by the Owner. <br /> Contractor Signature: Date 12/14/2018 <br /> 12/14/2018 <br /> Approval Recommended by Engineer: Y+" Date <br /> Owner Representative: x'. Date 18 <br /> ,��t`�.L�i 12/14/2018 <br /> C�..,a,,�:, Date <br /> Approval Recommended: ��,�,-.," <br /> Due to a stationing error on the Hobbs Upchurch plan set and a station equation error the bid quantity did not <br /> accurately reflect the length of the 12-inch force main required for the project.An additional 1,278 linear feet of <br /> force main was required at a unit price of$34.00 per linear foot resulting in a net increase of$43,452.00.JF <br /> Wilkerson also requested 18 additional days to install the additional force main.The Engineer reviewed this request <br /> and believed it to be reasonable and appropriate,likewise length of additional force main as well as the total length <br /> of force main have been measured and appear to be accurate. <br /> CPR 010 <br />