Orange County NC Website
DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Change Proposal Form <br /> Project: Efland SS to Mebane Phase 2 <br /> Contract: 16.01904 <br /> Contractor: JF Wilkerson Contracting, Inc. <br /> Utility <br /> Construction Proposal No. 007 <br /> Project No. CIP 30044 <br /> Contractor No. C077 <br /> Description of Change: <br /> Remove bid Items 57, 58 and 59-Contaminated Groundwater <br /> Items will be paid by unit pricing in the contract <br /> Item Qty Unit Unit Price Extended Price <br /> Pump Haul Contam Grd Wtr 5,000 Gal $ 1.00 $ (5,000.00) <br /> Remove Replace Contam Soil 500 CY $ 68.00 $ (34,000.00) <br /> Mob/Demob Frac Tank 1 LS $ 3,400.00 $ (3,400.00) <br /> Total Deduct: Contam Grd Wtr Removal $ (42,400.00) <br /> Time Extension Request 0 Days <br /> The contractor agrees to perform the work outlined in thes change proposal for the amount specified above and in accordance with the <br /> Contract documents if the work is authorized by the Owner. <br /> Contractor Signature: Date 12/14/2018 <br /> 12/14/2018 <br /> Approval Recommended by Engineer: Date 12 17 2018 <br /> Owner Representative: �.�� �,L�;;1 .. x'. ' Date <br /> Approval Recommended: Date 12/14/2018 <br /> �.:•��,-,: <br /> CPR 007 <br />