Orange County NC Website
DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> ray L;I k t <br /> EVOINEE3S JO'K-C)NTQAC- <br /> COf,L ME N T 5 <br /> CC hS%I ITT EE <br /> Work Change Directive No. 002 <br /> Date of Issuance: 5-23-2018 Effective Date: 5-23-2018 <br /> Owner: Orange County Owner's Contract No.: CIP 30044 <br /> Contractor: J.F. Wilkerson Contracting Co., Inc. Contractor's Project No.: <br /> Engineer: McGill Associates Engineer's Project No.: 16.01904 <br /> Project: Efland Sewer to Mebane Phase 2 Contract Name: <br /> Extension <br /> Contractor is directed to proceed promptly with the following change(s): <br /> Description: As discussed and agreed to during the quarterly project meeting, proceed with construction following <br /> the attached revised drawing.Altering the location and or depths of manholes 11, 12, and 13 as well as slope and or <br /> material of associated sewer lines. <br /> Attachments: Revised Sheet 6. <br /> Purpose for Work Change Directive: <br /> Directive to proceed promptly with the Work described herein, prior to agreeing to changes on Contract Price and <br /> Contract Time, is issued due to: [check one or both of the following] <br /> ❑Non-agreement on pricing of proposed change. <br /> ❑ Necessity to proceed for schedule or other Project reasons. <br /> Estimated Change in Contract Price and Contract Times(non-binding, preliminary): <br /> Contract Price $ No Change [increase] [decrease]. <br /> Contract Time No Change [increase] [decrease]. <br /> Basis of estimated change in Contract Price: <br /> ❑ Lump Sum ® Unit Price <br /> ❑ Cost of the Work ❑ Other <br /> RECOMMENDED: AUTHORIZED BY: RECEIVED: <br /> By: By:By• L nla fuu u i By: fni Ili �ry L <br /> engineer(Authorized Signature) Uwher(Authorized Signature) �cinuacrUr (Authorized Signature) <br /> Title: Title: Title: <br /> Date: 12/14/2018 Date: 12/17/2018 Date: 12/14/2018 <br /> Approved by Funding Agency(if applicable) <br /> By: Date: <br /> Title: <br /> EJCDC®C-940,Work Change Directive. <br /> Prepared and published 2013 by the Engineers Joint Contract Documents Committee. <br /> Page 1 of 1 <br />