Browse
Search
2018-819-E Planning - J W Wilkerson contract amendment Phase 2 Extension
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-819-E Planning - J W Wilkerson contract amendment Phase 2 Extension
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/7/2019 4:29:47 PM
Creation date
12/21/2018 4:42:28 PM
Metadata
Fields
Template:
Contract
Date
12/20/2018
Contract Document Type
Contract Amendment
Agenda Item
6/20/17
Amount
$149,449.09
Document Relationships
2017-279-E Planning - J.F. Wilkerson Contracting Co., Inc. - Notice of Award (Only) - Efland to Mebane Sewer, Phase 2 Extension
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2019-237-E Planning - JF Wilkerson Efland sewer contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-300-E Planning - J F Wilkerson contract amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-819 Planning - J W Wilkerson contract amendment Phase 2 Extension
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Change Proposal Form <br /> Project: Efland SS to Mebane Phase 2 <br /> Contract: 16.01904 <br /> Contractor: JF Wilkerson Contracting,Inc. <br /> Utility <br /> Construction Proposal No. 005 <br /> Project No. CIP 30044 <br /> Contractor No. C077 <br /> Description of Change: <br /> Relocate By-Pass Connection at Pump Station <br /> Item Qty Unit Unit Price Extended Price <br /> Material 1 LS $ 2,079.29 $ 2,079.29 <br /> Labor and Equipment 1 LS $ 2,250.00 $ 2,250.00 <br /> O&P @ 15% 1 LS $ 649.39 $ 649.39 <br /> Total Cost By-Pass Relocation $ 4,978.68 <br /> Time Extension Request 5 Days <br /> The contractor agrees to perform the work outlined in thes change proposal for the amount specified above and in accordance with the <br /> Contract documents if the work is authorized by the Owner. <br /> Contractor Signature: �1eL +�Y�,,w <br /> Date 12/14/2018 <br /> 12/14/2018 <br /> Approval Recommended by Engineer: Date <br /> �l r!ur� <br /> Owner Representative: _' C "-- Date 12/17/2018 <br /> Approval Recommended: Date 12/14/2018 <br /> At the request of the City of Mebane,a detail was created to show the possible relocation of the by pass <br /> pumping connections from inside the valve vault to an area immediately next the valve vault and above grade. <br /> This detail was then given to the Contractor to price,once the price was received and reviewed by the Engineer, <br /> County and City it was found to be reasonable and appropriate.The$4,978.68 cost and 5-day extension were <br /> captured by this Change Proposal Request. <br /> CPR 005 <br />
The URL can be used to link to this page
Your browser does not support the video tag.