DocuSign Envelope ID:A6E80449-4F51-48F6-85DB-7136A80CD513 <br /> Change Proposal Form <br /> Project: Efland SS to Mebane Phase 2 <br /> Contract: 16.01904 <br /> Contractor: JF Wilkerson Contracting, Inc. <br /> Utility <br /> Construction Proposal No. 3 <br /> Project No. CIP 30044 <br /> Contractor No. C077 <br /> Description of Change: <br /> Line B Revision <br /> Items will be paid by unit pricing in the contract <br /> Item Qty Unit Unit Price Extended Price <br /> 8" DIP 8-10 99 LF $ 62.00 $ 6,138.00 <br /> 8" DIP 10-12 126 LF $ 65.00 $ 8,190.00 <br /> 8" DIPO 12-14 50 LF $ 83.00 $ 4,150.00 <br /> 4' MH 12-14 1 EA $ 5,300.00 $ 5,300.00 <br /> 4"Sewer Serivice 1 EA $ 3,500.00 $ 3,500.00 <br /> Total Cost per Revision $ 27,278.00 <br /> Less Line B Plan Quantities(Bid Alternate#1) $ 26,325.00 <br /> Difference-Total Price Adjustment for CPR 5 $ 953.00 <br /> Time Extension Request 5 Days <br /> The contractor agrees to perform the work outlined in thes change proposal for the amount specified above and in accordance with the <br /> Contract documents if the work is authorized by the Owner. <br /> Contractor Signature: a,a9 Date 12/14/2018 <br /> (`Riau U�i��w <br /> rApproval Recommended by En I Icc Date <br /> - <br /> Owner Representative: o m ..�"'�"" ' Date <br /> Approval Recommended: �`°`°"' Date 12/14/2018 <br /> At the County's request plans for the possible future extension of Line B were created for review <br /> by the County and Engineer as well as pricing by the Contractor.To facilitate this potential future extension there would <br /> be an increase in the depth of the portion of Line B included in this project.The Contractor agreed to do this additional <br /> work at the unit price rate from the Contract, which after reviewing the Engineer believed to be reasonable and <br /> appropriate. At the County's direction McGill staff issued Work Change Directive 001 instructing the Contractor to install <br /> Manholes#29, #30 and associated sewer lines as shown on the revised plans with increased depths to allow for possible <br /> future expansion.The net increase of this change was $953.00. <br /> CPR 003 <br />