Browse
Search
Agenda - 09-29-2004-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 09-29-2004
>
Agenda - 09-29-2004-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:26:21 PM
Creation date
8/29/2008 10:24:18 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2004
Document Type
Agenda
Document Relationships
Minutes - 20040929
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1: Summary of Similar Projects <br />Project <br />Hours <br />Total <br />Stage of Implementation <br />Software Programs* <br />(approx.) <br />Cost <br />City of Santa Monica <br />510 <br />$32,000 <br />ICLEI report is 97% complete. <br />CCP GHG Emissions <br />GHG Emissions <br />USD <br />The implementation of the Local <br />Software — Version 5 0, <br />Reduction Local Action <br />Action plan is ongoing <br />US Edition <br />Plan <br />CACP Software — Beta <br />Version <br />City of Chicago <br />2,410 <br />$160,000 <br />The ICL EI report is 100% <br />CCP GHG Emissions <br />Emissions Inventory and <br />USD <br />complete. The implementation <br />Software — Version 5.0, <br />Compilation of Emission <br />of the Local Action plan is <br />US Edition <br />Reduction Measures <br />ongoing. <br />CACP Software — Beta <br />Version <br />City of Mississauga <br />710 <br />$45,000 <br />The ICI El report is 100% <br />CCP GHG Emissions <br />Corporate Local Action <br />CAD <br />complete. The City us currently <br />Software — Version 5.0, <br />Plan and Community <br />considering funding options to <br />U S. Edition <br />Emissions Inventory and <br />begin implementation of the <br />Consultation Plan <br />Local Action Plan. <br />Region of Peel Corporate <br />550 <br />$35,000 <br />The ICLEI report is 100% <br />CCP GHG Emissions <br />GHG Inventory, Local <br />CAD <br />complete. The Town is <br />Software — Version <br />Action Plan, and Waste <br />currently developing a phase -in <br />3.63, Canadian Edition <br />Measures O portundties <br />plan. <br />Region of York <br />480 <br />$30,000 <br />The ICL.EI report is 90% <br />CCP GHG Emissions <br />CAD <br />complete Portions of the Local <br />Software — Version <br />Action Plan are already <br />3 63, Canadian Edition <br />underway. <br />_ <br />City of Sudbury GHG <br />1100 <br />$69,000 <br />The ICL.EI reports are 100% <br />CCP GHG Emissions <br />Emissions Inventory, City <br />CAD <br />complete. The Local Action <br />Software — Version <br />of Sudbury GHG Target <br />Plan is ongoing and they are <br />3.63, Canadian Edition <br />Analysis and <br />monitoring and verifying its <br />Recommendation <br />progress <br />* The CCP GHG Software was used to calculate GHG enuissionns The CACP Software was used to <br />calculate God: the criteria air contaminant emissions (i e NOx, SOx, VOC, CO, PAd 10) and GHG <br />emissions lichen the CACP Software was in its Beta form, both of the software programs were utilized <br />so the client would have the standard GHG Software version of their work and the Beta CACP <br />Softrva e version (The CACP Software has the sa ie capacity to calculate GHG emission -s as the CCP <br />GHG Software, with the added capacio+ to calculate criteria air contaminants) <br />4. Generally, how many local meetings do you anticipate to accomplish the project? At what points <br />in the process would you hold meetings, and for what purpose? <br />Typically, we begin these projects with a Kick -Off Meeting. At the Kick -Off Meeting we discuss the <br />wmkplan and the schedule for subsequent meetings. Our past experience with this type of work has <br />involved three on -site meetings, therefore we have scoped this work with three meetings in -mind. <br />However, we are open to revisiting this matter (as well as others), if we are selected to fulfill the contract <br />For instance, there may be the opportunity to add more on -site visits coinciding with ICL.EI USA's work in <br />the region, <br />A general description of die anticipated meetings, tinning and purpose is provided below: <br />
The URL can be used to link to this page
Your browser does not support the video tag.