Browse
Search
Agenda - 09-29-2004-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 09-29-2004
>
Agenda - 09-29-2004-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:26:21 PM
Creation date
8/29/2008 10:24:18 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2004
Document Type
Agenda
Document Relationships
Minutes - 20040929
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
-- Response to Specific Questions Regarding RFQ Submission -- <br />Joint Carrboro, Chapel Hill & Orange County <br />GHG Emissions Inventory & Reduction Plan <br />March 9, 2004 <br />Megam.Janrieson, ICI,EI Energy Services, niiai)iiesoii(a iclei.oi (416) 392 -1480 <br />Below are each of the questions you had regarding ICLEI Energy Services' response to the Joint Carrboro, <br />Chapel Hill & Orange County RFQ for a GHG Emissions Inventory and Reduction Plan. Please don't <br />hesitate to contact Megan Jamieson at the phone number above if there are any additional questions or <br />points of clarification. <br />1. Please expand on how you would address the linkages between the GHG Inventory /Action Plan <br />and the Metropolitan Planning Organization's 2025 Transportation Plan. <br />Ideally, we would meet with the Durbam - Chapel -Hill- Carrboro Metropolitan Planning Organization <br />(DCHC MPO) at the onset of the project, This would give ICLEI, the DCHC MPO, and the Regional <br />Inventory/Action Plan Working Group the opportunity to discuss the two plans to see how they can be <br />brought together for the benefit of both plans, We anticipate that the DCHC MPO has already <br />implemented some projects that have had an impact on transportation and therefore GHG emissions within <br />the region. ICLEI would want to capture these projects in Phase 3 —Determine and _Onantify Historic and <br />Existing Measures of the Project Approach outlined in our RFQ submission (see Page 2) The 2025 L.ong - <br />Range Transportation Plan (2025 LRTP) also has measures planned for the future, such as the Bus Transit <br />Plan and the Bicycle Pedestrian Plan. These Plans will reduce the generation of GHG emissions and <br />therefore will be captured in Phase 4 — Identify Potential New A9easiaes of the Project Approach outlined <br />in our RFQ submission (see Page 2). <br />Greenhouse Gas emissions from dre transportation sector are a large contributor to the region's overall <br />emissions profile Therefore, it is essential to focus on this sector when designing a plan to reduce overall <br />GHG emissions, ICLEI plans to invite members of the DCHC MPO to participate in the Air Quality <br />Advisor Group to help guide and implement the GHG Emissions Inventory and Reduction Plan <br />2 List up to 6 projects most similar in scope to the Joint Carrboro, Chapel Hill, & Orange County <br />GHG emissions inventory and reduction plan. Include hours required to fulfill contract <br />requirements, total cost and stage of implementation <br />3 For each of the six selected projects, indicate clearly what software programs and versions were <br />used to perform the analyses. If the ICLEI Clean Air and Climate Protection (CACP) software <br />was not used, please indicate what aspects of analysis were provided by the software employed <br />that is not provided by CACP. <br />The following table addresses the questions in bullets 2 and 3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.