Browse
Search
Agenda - 09-29-2004-
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 09-29-2004
>
Agenda - 09-29-2004-
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2013 4:26:21 PM
Creation date
8/29/2008 10:24:18 AM
Metadata
Fields
Template:
BOCC
Date
9/29/2004
Document Type
Agenda
Document Relationships
Minutes - 20040929
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORANGE REGIONAL GREENHOUSE GAS EMISSIONS INVENTORY AND REDUCTION PLAN <br />REQUEST FOR QUALIFICATIONS PAGE 2 <br />requirements for fulfilling the local governments' commitments to ICLEI's Cities for <br />Climate Protection Campaign: <br />Inventory greenhouse gas emissions during a selected base year; <br />Forecast greenhouse gas emissions over a selected planning period up to a <br />target year; <br />Facilitate the Air Quality Advisory Group in selecting a Reduction Target; <br />Identify actions that the local governments, business and industry, and the <br />community could take to reduce greenhouse gas emissions during the planning <br />period; <br />Develop the Greenhouse Gas Emissions Reduction Action Plan that includes: <br />• Existing Measures <br />• Quantification of Greenhouse Gas Emissions Reductions of Existing Measures <br />• Potential New Measures <br />• Quantification of Greenhouse Gas Emissions Reductions of Potential New <br />Measures <br />• Recommendation of Measures to Achieve Greenhouse Gas Emissions Target. <br />The process should also develop connections between actions proposed in the <br />Greenhouse Gas Emissions Reduction Action Plan and the adopted Durham - <br />Chapel Hill- Carrboro 2025 Long Range Transportation Plan to show how the <br />Emissions Reduction Action Plan implements the DCHC 2025 Long Range <br />Transportation Plan for achieving air quality conformity for ozone, All <br />transportation- related tasks and components should be accounted for <br />separately for grant reimbursement purposes, as previously noted. <br />Requirements <br />Responses submitted should be concise and shall be limited to a maximum of 25 <br />pages. All respondents shall address the following, as a minimum, and should <br />conform to the numbering system used below. <br />I , Name, address and telephone number of the firm or individual, with contact <br />name(s). <br />2. Statement substantiating firm's understanding of project objectives to include <br />description of the final products your firm would provide. <br />3. Names of key personnel who would be available to work on the project, their <br />titles, experience, professional licenses, professional affiliations and other <br />qualifications, and years with the firm; total size of firm's staff. <br />4. Proposed project manager and written summary of two projects the proposed <br />project manager has completed in the last five years. <br />5. Statement of qualifications of the firm. <br />b. List of previous clients for work similar to this project conducted over the past five <br />years, with project size, scope, cost, location, time adherence, and contact <br />names and telephone numbers. <br />7. Three client references from local government agencies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.