A break down of the cost increases is included on the first spreadsheet under Summary of <br />Cost Increases. The first column includes increased square footage, site work and the <br />reduction of "smart growth" by $300,000. The second column details the impact of the <br />cost per square foot increase and the ripple effect in other areas. <br />Cost Reduction Options <br />The second spreadsheet provides two options for completing the new high school. Both <br />will require significant additional funding. Each option has funding listed after the <br />"Anticipated CIP Funding," the $982,000 set aside for field construction in the 2004- <br />2014 CIP. The "Final Difference" reflects the difference between the projected cost and <br />the $30,842,000 already secured for the project and the $982,000 reserved for the fields. <br />Cost reduction options are summarized on the building cost, site work cost and day <br />lighting cost spreadsheets. Each is attached for your review,. <br />Option 1 <br />Option 1 includes a complete high school with all the fields and auditorium complex <br />intact. Cost reductions used are listed on the value engineering spreadsheet under Cost <br />Reduction Options 1 / 2. These reductions were made during an analysis of the project <br />and will have a minimal impact on the functionality of the project. They include <br />reductions in kitchen and media furnishings, the use of utility brick and the reduction in <br />the use of some metals. Site reductions include reduced retaining walls, landscaping and <br />concrete walkways. These reductions will have little impact on the project and would <br />have been included in a regular value engineering review. These reductions are included <br />in the other options listed below. <br />Additional Funding Required $3,402,304 <br />Option 2 <br />Option 2 moves the entire auditorium complex to phase 2. This area includes the <br />auditorium, chorus, band rooms and associated offices. The plan compensates for the loss <br />of the wing by adding a large multipurpose room for chorus or, if needed, wrestling. This <br />area would be converted upon completion of the auditorium wing. All the athletic fields <br />are intact in Option 2. The value engineering cost savings featured in Option 1 /2 is also <br />included in this option. Site cost reductions are identical as well. These reductions can be <br />found on the attached spreadsheets. <br />Additional Funding Required $1,897,491 <br />With large increases in square foot costs and an initial budget that was $4,000,000 less <br />than requested, it is clear that additional funding will be needed. Avenues for additional <br />funding include a reprioritization of the 2004 -2014 CIP, a request for additional funding <br />to the County Commissioners, or the deletion of some parts of the program as illustrated <br />in the options above. <br />As the preparation of construction documents moves forward, it will be important to note <br />any major shifts, such as suggested above, be made as soon as possible so that schedules <br />are not impacted. <br />