Orange County NC Website
Then Now % <br /> Sitework Construction 2000 2004 Difference <br /> Heavy-duty asphalt roadways (9,000 sy) $153,000 $171 ,000 + 12% <br /> Light-duty asphalt parking lots (21 ,000 sy) $252,000 $277,000 + 10% <br /> Concrete Sidewalks (38,500 sf) $106,000 $145,000 +37% <br /> Asphalt Sidewalks (6,750 sf) $67,500 $78,300 + 16% <br /> Concrete Curb & Gutter (10,900 If) $109,000 $122,000 + 12% <br /> Ductile-iron On-site Water Pipe (1 ,500 If) $31 ,000 $39,000 + 26% <br /> Concrete Stormwater System (5,000 If) $100,000 $120,000 + 20% <br /> Sanitary Sewer System (1 ,500 If) $37,500 $52,700 + 44% <br /> $856,000 $1 ,005,000 + 17% <br />