Browse
Search
2016-741-E AMS - Triangle Landscaping Annex brick replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-741-E AMS - Triangle Landscaping Annex brick replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2019 4:21:02 PM
Creation date
12/18/2018 8:36:59 AM
Metadata
Fields
Template:
BOCC
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:22BODOB5-3527-4BC4-9E8E-DACAEEE3FB76 <br /> Triangle Landscaping Inc. Estimate <br /> PO Box 144 <br /> Stein,NC 27581 Date Estimate# <br /> 1011/2013 200 <br /> Name I Address <br /> Orange County Asset Management Services <br /> 131 West Margaret Lane <br /> Hillsborough,NC 27278 <br /> Project <br /> Description Qty Cost Total <br /> This is an estimate to tear down brick retaining walls and rebuild <br /> with block and brick at 209 South Cameron Street(Annex Building) <br /> This estimate is for the wall to the right if facing back of building,if <br /> wall to the left is also done which we recommend to match Brick, <br /> estimate would be the satne for second, <br /> Teas down and Haul away debris(Brick,Mortar,and any other debris 750.00 750.00 <br /> behind wall) <br /> If Footer is in goad shape we will clean it up and re-use{Assuming <br /> their is a Footer) <br /> If Footer is not usable we will dig it out haul away and re-pour new 1,300.00 1,300.00 <br /> one.This cost would be <br /> Rebuild a t2"Wall using 8"Block and 4"Brick(Will drill holes in 2,600.00 2,600.00 <br /> existing footer for Vertical Rebar to add strength every 4')32'Long <br /> 4'High with Rowlock cap <br /> Materials Needed 1,800.00 t,800.00 <br /> 1200 Brick, 140-8"block, le- 1/2.Eights,2 wall end corners, 15 <br /> bags type S Brixment,2 yards of sand,40'Rebar#5, 1-5 gallon <br /> bucket of Surelock water proofing <br /> Drainage Gravel and Pipe will be put in behind walls.Drainage pipe 1,500.00 1,500.00 <br /> will be tied into existing pipe running out by parking lot. <br /> Apply new mulch to give a clean finish 250.00 250.00 <br /> Level and Seed area back as it was found 250.00 250.00 <br /> Taal $8,450.00 <br /> Signature <br /> may. <br /> Phone# Fax# <br /> 919-730-5267 919-529-4901 <br />
The URL can be used to link to this page
Your browser does not support the video tag.