Browse
Search
2016-722-E Emergency Svc - Federal Engineering consulting
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-722-E Emergency Svc - Federal Engineering consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 9:42:53 AM
Creation date
12/18/2018 8:32:07 AM
Metadata
Fields
Template:
Contract
Date
10/4/2016
Contract Starting Date
10/1/2016
Contract Document Type
Agreement - Consulting
Amount
$89,999.00
Document Relationships
2017-729-E EMS - Federal Engineering ORNC amendment April 2017
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-730-E EMS - Federal Engineering ORNC amendment June 2017
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-263-E Emergency Svc - Federal Engineering
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E <br /> - 1 Orange County, North Carolina <br /> ORANGE Countywide Radio Communications <br /> COUNTY <br /> NUM[i(AHO INA Interoperability and System Engineering Services <br /> 1.2 Overall Project Approach (RFP 5.13.1) <br /> Building on the work that FE performed for Orange County in 2013, FE proposes a phased approach <br /> for the execution of this project. Our proposed scope of work is partitioned into the following phases <br /> and tasks: <br /> Phase 1—Needs Assessment and Solution Selection <br /> • Project initiation <br /> • User interviews/ needs assessment <br /> • Analysis of site information <br /> • Interoperability analysis <br /> • Alternatives analysis <br /> • Coverage analyses <br /> • Budgetary estimates <br /> • County selects system option for procurement <br /> Phase 2—Procurement Support <br /> • RFP preparation <br /> • Vendor proposal review and recommendations <br /> • Pre-bid meeting support (optional) <br /> • Vendors' questions responses (optional) <br /> • Attend vendor best and final presentations (optional) <br /> • Contract negotiations support(optional) <br /> Scope of <br /> Task No. • • <br /> Phase 1—Needs Analysis and Alternatives Analysis <br /> Perform Needs Analysis 3.2 <br /> Meet with management personnel and end users of the current <br /> infrastructure to develop a comprehensive needs analysis addressing 5.C.1 3.2.1 <br /> functionality, capability and needs of all current infrastructure users. <br /> A draft needs analysis shall be presented to the end-users for validation in <br /> 5.C.1 3.2.2 <br /> at least two group meetings and then to the committee for final approval. <br /> Gather, analyze, and document operational, functional, and specific <br /> technical information of existing fixed sites and associated equipment for <br /> various emergency service departments that serve Orange County <br /> residents (may be an Orange County-based agency or a department in a 5.C.2 3.2.2 <br /> County adjacent to Orange County that serves/protects geography within <br /> Orange County), or Orange County emergency service departments that <br /> serve residents outside Orange County in order to understand the present <br /> status of our communications capabilities. <br /> Copyright Protected Do Not Duplicate 5 �, <br />
The URL can be used to link to this page
Your browser does not support the video tag.