Browse
Search
2016-722-E Emergency Svc - Federal Engineering consulting
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2016
>
2016-722-E Emergency Svc - Federal Engineering consulting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/10/2019 9:42:53 AM
Creation date
12/18/2018 8:32:07 AM
Metadata
Fields
Template:
Contract
Date
10/4/2016
Contract Starting Date
10/1/2016
Contract Document Type
Agreement - Consulting
Amount
$89,999.00
Document Relationships
2017-729-E EMS - Federal Engineering ORNC amendment April 2017
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2017-730-E EMS - Federal Engineering ORNC amendment June 2017
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
2018-263-E Emergency Svc - Federal Engineering
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:67496B91-FCOD-4188-A6C5-F7496722386E <br /> Orange County, North Carolina <br /> ORANGE Countywide Radio Communications <br /> NOOJTIA NonrO['A2ncIxw Interoperability and System Engineering Services <br /> 1 COST PROPOSAL <br /> 1.1 Firm Fixed Price <br /> The total project cost, including labor, travel, and other direct costs for the Orange County <br /> Countywide Radio Communications Interoperability and System Engineering Services project is <br /> $73,477. <br /> As requested in Section 6.0 of the RFP, the following table provides a breakdown of hourly labor <br /> rates by team member. Anticipated hours on the project are 546. <br /> eta - • r <br /> Tearn Member and Role Hourly-Rate <br /> Travis LePage, Project Director $170 <br /> Cliff Brown, Project Manager and Technical Lead, Senior Consultant $145 <br /> Adam Nelson, RI= Performance Specialist, Senior Consultant $130 <br /> The balance of this page is intentionally left blank. <br /> .i <br /> y Copyright Protected Do Not Duplicate 1 � <br />
The URL can be used to link to this page
Your browser does not support the video tag.