Browse
Search
Agenda - 09-21-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 09-21-2004
>
Agenda - 09-21-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2008 3:47:49 AM
Creation date
8/29/2008 10:23:59 AM
Metadata
Fields
Template:
BOCC
Date
9/21/2004
Document Type
Agenda
Agenda Item
9a
Document Relationships
Minutes - 20040921
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
l~ <br />reviews will be required. They are now examining a parCial or slab approval <br />that would allow site work to begin before the final approval takes place. This <br />idea has only recently been introduced and a final answer on the feasibility of <br />the request has not been received. <br />• The lengthy site selection process by the Board of L^ducation took longer than <br />expected. The additional review of the Old L,ystra Road and the Southern Park <br />site removed time From an already compressed schedule. Re-reviews of sites <br />requested by the Commissioners also added time to the site selection process, <br />• A delay in approval of the use of etninent domain by the County <br />Commissioners, Cied to Che interlocal agreement, has also contributed to delays <br />in the project. The use of the interlocal agreement required several board <br />meetings stretching over the sunmier months in 2003. <br />• The length of time devoted to the interlocal agreement, addendum "B" and <br />"smart growth" efforts that are still not completed have added time to the <br />planning effort. <br />• The change in projecC architects by Moseley Architects has required additional <br />transition time. <br />• Support Services experienced a delay in securing permission to do field work <br />on Che Glover property, again adding to the potential for delay.. <br />While no single group or firm contributed excessively to the delay, all the involved <br />parties collectively contributed their small part. Those small parts when combined <br />together have resulted in a schedule that may not be met. <br />4. Square Footage <br />The original square footage of the building was established at 182,000 square feet <br />The $30,000,000 budget reduced that figure to 155,000 square feet. The present <br />option contains 161,556 square feet. That square footage has been reviewed by staff <br />and architects for additional areas for reduction and few, if any, are available. Any <br />further reduction in square footage would have a permanent impact on the core <br />facilities that would be difficult to compensate for later. To reach the square foot <br />target of 155,000 would require a reduction of an additional 6,500 square feet. This is <br />the equivalent of eight classrooms or the auditorium. A review of the comparable <br />projects around the state indicates that our square footage is lower than other similar <br />sized projects. <br /> Student S uare Foota e S .Ft. Per S .Ft. Per <br />Project Capacity Core Total Capacity Core <br />Southside 750 1,286 169,674 226 132 <br />Northside 905 1,225 176,510 195 144 <br />CHCCS 800 1,200 163,500 204 136 <br />Cedar Ride 1,000 1,500 206,900 207 138 <br />Using the School Planning Division guidelines and extrapolating a 1,200-core <br />capacity, a square footage requirement of over 170,000 square feet is indicated. As <br />the High School Advisory Committee worked through the design and development <br />
The URL can be used to link to this page
Your browser does not support the video tag.