Browse
Search
2018-803-E AMS - Phoenix Fire Smoke Detection System Eno Fire Change Request
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-803-E AMS - Phoenix Fire Smoke Detection System Eno Fire Change Request
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/28/2018 10:30:04 AM
Creation date
12/12/2018 4:10:00 PM
Metadata
Fields
Template:
Contract
Date
12/5/2018
Contract Starting Date
9/12/2017
Contract Document Type
Contract Amendment
Amount
$3,633.00
Document Relationships
2017-468-E ES - Phoenix Fire Protection, Inc. to design and install wet sprinkler systems
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2017
R 2018-803 AMS - Phoenix Fire Smoke Detection System ENO Fire Change Request
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Revised 10/17 <br /> <br />ORANGE COUNTY <br /> CHANGE ORDER REQUE <br />NORTH CAROLINA <br /> <br />___________________________________________________________________________________________________ <br />Date: 12/5/2018 Project: ES - Sprinkler System at ENO Fire Dept and EMS Station 1 Change <br /> Department: Emergency Services Department Address: 510 Meadowlands Drive, Hillsborough NC 27278 Pr <br /> Contractor: Phoenix Fire Protection, Inc. Contractor Address: 2857 Lee Ave., Sanford NC 27332 Effective <br />original contract: September 12, 2017 <br /> <br />This change order increases decreases the contract time by days. Check here if no impact to contract time <br /> <br />Will this change order impact the date of substantial completion? Yes No. If yes, the amended date of subs <br />completion is: <br />___________________________________________________________________________________________________ <br /> <br />Full Description of Change: This change request is to add interconnected smoke detection system to the sleeping quarters <br />the previously approved and installed sprinkler system at the Eno Fire Department as required by the Orange County Fire <br />Building Inspections Department <br /> <br />Reason for Change: This change is to add the smoke detection system that was not included as a portion of the base scop <br />was change was requested by the inspections department after the base contract was awarded. <br />___________________________________________________________________________________________________ <br /> <br />Original contract sum: $ 39,055.00 <br /> <br />Contract sum prior to this change order: $ 39,055.00 <br /> <br />Amount of this change order: $ 3,633.00 <br /> <br />Total sum of the contract including this change order: $ 42,688.00 <br /> <br />___________________________________________________________________________________________________ <br />This change order is executed to amend the contract time and/or contract sum. It shall not be construed to impact the o <br />project, services, or work in any other manner. <br />Approved and executed this 5th day of December, 2018. <br />_______________________________ _____________________________ ____________________ <br />Contractor Owner Architect (when retained <br /> <br />By:____________________________ By:___________________________ By:__________________ <br /> <br /> <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: 4069CA99-5827-45B2-BE9F-9A0110C81475 <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.