Browse
Search
Agenda - 12-11-2018 8-b - Fiscal Year 2018-19 Budget Amendment #4
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 12-11-2018 CANCELED (items addressed 12-18-2018)
>
Agenda - 12-11-2018 8-b - Fiscal Year 2018-19 Budget Amendment #4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2018 3:29:31 PM
Creation date
12/6/2018 3:32:12 PM
Metadata
Fields
Template:
BOCC
Date
12/11/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-b
Document Relationships
Agenda - 12-11-2018 Regular Board Meeting CANCELED
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 12-11-2018 CANCELED (items addressed 12-18-2018)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 8 <br /> Proposed Budget Amendment <br /> Department: Emergency Services <br /> Current Proposed <br /> Division Name of Fee Reason for Increase Rate Rate Effective Date <br /> A construction permit is required for the installation <br /> of or mondification to emergency responder radio <br /> coverage systems and related equipment. <br /> Maintenance performed in accordance with this code <br /> Emergency responder radio is not condsidered to be a modification and does not <br /> Fire Marshal coverage system require a construction permit. $0.00 $200.00 January 1,2019 <br /> Gates and barricades A construction permit is for the installation of or <br /> across fire apparatus modification to a gate or barricade across a fire <br /> Fire Marshal access road apparatus access road. $0.00 $100.00 January 1,2019 <br /> Construction permits are required for installation of <br /> or alteration to smoke control or smoke exhaust <br /> systems. Maintenance perfomed in accordance to <br /> Smoke control or smoke this code is not considered to be an alteration and <br /> Fire Marshal exhaust systems does not require a permit. $0.00 $200.00 January 1,2019 <br /> A construction permit is required to install or modify <br /> solar photovoltaic power systems. Maintenance <br /> performed in accordance with this code is not <br /> Solar photovoltaic power considered to be a modification and does not require <br /> Fire Marshal systems a permit. $0.00 $100.00 January 1,2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.