<br />• removing and reworking all electrical components, <br />• removing and replacing the existing heating and cooling system located on the roof, <br />• installing new ductwork to the courtroom, jury room and Judge’s Chamber, <br />• replacing all contaminated flooring and cabinetry, <br />• replacing the existing roof system with a new roof system, including all curbs and <br />parapet walls, <br />• reattaching the gutter system, <br />• replacing and insulating roof drain piping, <br />• installing a roof access ladder, <br />• working with an engineer and architect to seal the design drawings for the roof <br />replacement, and <br />• obtaining all necessary permits and other documentation necessary to use the <br />courtroom and adjacent spaces <br /> <br />In emergency situations, the Board is authorized to bypass formal bid procedures by finding <br />that an emergency condition is present that represents a threat to the health and safety of the <br />people and their property. In this case, the mold growth and potentially hazardous indoor air <br />quality in the courtroom represents such a health emergency. Staff is recommending that the <br />Board make this finding to allow the scope of work to proceed expeditiously. This finding is <br />included in the Manager’s Recommendation. <br /> <br />Since this project was not anticipated as part of the Capital Budget, a budget amendment is <br />also necessary to finance this project. Staff recommends that the following funds be <br />reallocated from existing projects to fund the remediation and reconstruction of the Battle <br />Courtroom. This budget amendment provides for the reallocation of funds and amends the <br />following Capital Project Ordinances: <br /> <br />Efland Sewer Extension Project (-$400,000) - Project # 30017 <br /> <br />Revenues for this project: <br /> Current <br />FY 2018-19 <br />FY 2018-19 <br />Amendment <br />FY 2018-19 <br />Revised <br />Alternative Financing $291,654 $0 $291,654 <br />From Other Projects $198,286 $0 $198,286 <br />From General Fund $441,000 ($400,000) $41,000 <br />Total Project Funding $930,940 ($400,000) $530,940 <br /> <br /> Appropriated for this project: <br /> Current <br />FY 2018-19 <br />FY 2018-19 <br />Amendment <br />FY 2018-19 <br />Revised <br />Efland Sewer Extension Project $930,940 ($400,000) $530,940 <br />Total Costs $930,940 ($400,000) $530,940 <br /> <br /> <br />Information Technologies Project (-$200,000) - Project # 30007 <br /> <br />Revenues for this project: <br /> Current <br />FY 2018-19 <br />FY 2018-19 <br />Amendment <br />FY 2018-19 <br />Revised <br />Alternative Financing $11,053,245 ($200,000) $10,853,245 <br />From General Fund $1,595,257 $0 $1,595,257 <br />Appropriated Fund Balance $200,000 $0 $200,000 <br />Total Project Funding $12,848,502 ($200,000) $12,648,502 <br />2