Browse
Search
2018-768-E Housing - David Sims utility allowance report preparation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-768-E Housing - David Sims utility allowance report preparation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 4:30:41 PM
Creation date
12/3/2018 12:27:52 PM
Metadata
Fields
Template:
Contract
Date
11/29/2018
Contract Starting Date
11/29/2018
Contract Ending Date
11/29/2019
Contract Document Type
Contract
Amount
$2,950.00
Document Relationships
R 2018-768 Housing - David Sims utility allowance report preparation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:739D4C9E-26DC-45C4-A5C5-lB75846342B1 <br /> Da vid Sims&Associates <br /> Consulting Engineers, P. C. <br /> 108 Giles Avenue,Suite 100 (910)791-8016 <br /> Wilmington,NC 28403 Fax(910)395-5734 <br /> NC License C-1150 <br /> May 16,2018 <br /> Sherrill Hampton,Executive Director <br /> Orange County Housing Authority <br /> Orange County,NC <br /> Via Email to sham pton(c�oran eg�ountync.gav <br /> RE: Section 8 Utility allowance Report <br /> Dear Ms.Sherrill: <br /> I would like to make the following proposal to provide a utility allowance report for the Orange <br /> County section 8 housing. The cost will include a trip to your Housing Authority to inspect <br /> several typical units of each housing type(apartments,houses and mobile homes). <br /> • The cast for the 1st year(original report)would be$2,950.00 <br /> • To update the report would be$1,225.00 for each additional year(pricing good for 2 <br /> additional years). <br /> Summary of cost: <br /> ■ 1-year contract cost:$2,950.00 <br /> ■ 2-year contract cost:$4,175.00 <br /> • 3-year contract cost:$5,400.00 <br /> Work beyond the above scope can be provided at the following hourly rates: <br /> Principal $145.00/hr Sr.Technician $75.00/hr <br /> Engineer $115.00/hr Technician $65.00/hr <br /> Designer $95.00/hr Clerical $45.00/hr <br /> Please let me know if I can be of service. <br /> Sincerely, <br /> DAVID SIMS&ASSOCIATES <br /> CONSULTING ENGINEERS,P.C. <br /> s <br /> OacuSigned dy: <br /> CHRISTOPHER M.LIPPINCOTT, P.E. aua Ie 11/29/2018 <br /> 9EE0=29E7BA447B... <br /> ACCEPTED BATE <br /> \\dsa-server-pc\f\WOAFPROC\PROP4SA4\47fl0\PROP47 19 Orange County Housing Authority.doex <br />
The URL can be used to link to this page
Your browser does not support the video tag.