Browse
Search
2018-758-E DEAPR - S&ME Gas Survey for old Hillsborough landfill
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-758-E DEAPR - S&ME Gas Survey for old Hillsborough landfill
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 9:23:14 AM
Creation date
12/3/2018 12:26:33 PM
Metadata
Fields
Template:
Contract
Date
11/20/2018
Contract Starting Date
12/3/2018
Contract Document Type
Agreement - Consulting
Amount
$29,862.00
Document Relationships
2018-806-E DEAPR - SME Landfill gas survey amendment
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
R 2018-758 DEAPR - S&ME Landfill Gas Survey Hillsborough landfill
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:9D837DE1-58E6-47AF-80AC-29E747EBFFCE <br /> si Proposal for Above-Ground Landfill Gas Survey and Stream Sampling <br /> Hillsborough Dump <br /> ID No. NONCD0000483 <br /> Task Orders 483DP-4,5 and 6 <br /> • The inlet port of each meter will be set at approximately six-inches above the ground surface at each <br /> location. The meters will be operated for approximately one minute at each location and the readings will <br /> be recorded on a pre-developed form. <br /> • A flag with the name of the screening location (Le, 134) will be placed at each location where compounds <br /> are detected. GPS coordinates will be collected at these locations. <br /> + A temperature and humidity meter(thermohygrometer)will be used to record these parameters in <br /> ambient air at least hourly. <br /> • A figure called Above Ground Vapor Survey Map will be prepared that identifies the locations where <br /> detections above background concentrations were recorded during the survey. This map will only be <br /> provided if detections are recorded above background concentrations. <br /> Refer to Figure 1 for the proposed sampling grid. <br /> Subtask B Surface Water and Sediment Sampling <br /> Sample Protocol <br /> Media samples will include surface water and stream sediment,and will be collected by the methods described in <br /> S&ME's Standard Operating Procedures and Quality Assurance(SOP/QA) Manual('Judy 2070), previously approved <br /> by NCDEQ. Media samples will be analyzed by a North Carolina certified laboratory using the most current USEPA. <br /> Contract Laboratory Program Target Compound list for: <br /> • Volatile organic compounds(VOCs) by EPA Method 8260, including the 10 largest tentatively identified <br /> compounds (TICs); <br /> • 1,4-Dioxane by Method 8260SIM <br /> • Semi-volatile organic compounds(SVOCs)by Method 8270 including the 10 largest TICS; <br /> • Metals by totals analysis(antimony,arsenic, beryllium, cadmium, chromium, copper,iron, lead, <br /> manganese, nickel,selenium,silver,thallium,and zinc) by Method 6020; <br /> • Mercury by Method 7471 (solids) or 7470A(liquid); <br /> • Ammonia by Method 350.1 or 9050;. <br /> • Sulfate by Method 300 or 9056;and <br /> ■ Nitrate by Method 300,9056, or 353.2. <br /> S&ME will collect surface water and sediment samples at the eight locations shown on the attached site map <br /> (Figure 1) according to our SC]P/QA Manual. The coordinates of the surface water and sediment samp#e location <br /> will be recorded by S&ME with a GPS unit, S&ME field personnel will also take photographs of each sample <br /> location,stream sampling activities, and site conditions/areas of interest(stream conditions such as the exposed <br /> waste along the streambank on the southern portion of the site) relevant to future assessment and eventual <br /> remediation of the site, <br /> S&ME will collect the samples in a downstream-to-upstream order. If the surface water samples are highly turbid, <br /> samples will be collected in separate collection containers and then decanted into the laboratory supplied sample <br /> containers, For the purposes of quality assurance,the samples for metals analysis will be allowed to settle for a <br /> maximum of five minutes. Collection containers will be supplied by the laboratory and will consist of the same <br /> materials as the sample containers. <br /> November 6, 2018 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.