<br />   		•    removing and reworking all electrical components,
<br />   		•    removing and replacing the existing heating and cooling system located on the roof,
<br />   		•    installing new ductwork to the courtroom, jury room and Judge's Chamber,
<br />   		•    replacing all contaminated flooring and cabinetry,
<br />   		•    replacing  the  existing  roof system  with  a  new  roof system,  including  all  curbs  and
<br />			parapet walls,
<br />   		•    reattaching the gutter system,
<br />   		•    replacing and insulating roof drain piping,
<br />   		•    installing a roof access ladder,
<br />   		•   working  with  an  engineer  and  architect  to  seal  the  design  drawings  for  the  roof
<br />			replacement, and
<br />   		•    obtaining  all   necessary  permits  and  other  documentation   necessary  to  use  the
<br />			courtroom and adjacent spaces
<br />      	In emergency situations, the Board is authorized to bypass formal bid procedures by finding
<br />      	that an emergency condition is present that represents a threat to the health and safety of the
<br />      	people and their property.   In this case, the mold growth and potentially hazardous indoor air
<br />      	quality in the courtroom represents such a health emergency.  Staff is recommending that the
<br />      	Board make this finding to allow the scope of work to proceed expeditiously.   This finding is
<br />      	included in the Manager's Recommendation.
<br />      	Since this project was not anticipated as part of the Capital Budget, a budget amendment is
<br />      	also  necessary  to  finance  this  project.     Staff  recommends  that  the  following  funds  be
<br />      	reallocated  from  existing  projects  to fund  the  remediation  and  reconstruction  of the  Battle
<br />      	Courtroom.   This budget amendment provides for the reallocation of funds and amends the
<br />      	following Capital Project Ordinances:
<br />      			Efland Sewer Extension Project (-$400,000) - Project #30017
<br />      			Revenues for this project:
<br /> 										Current  	FY 2018-19       FY 2018-19
<br />       									FY 2018-19       Amendment 	Revised
<br />				Alternative Financing 			$291,654   		$0  	$291,654
<br />				From Other Projects  			$198,286   		$0  	$198,286
<br />				From General Fund   			$441,000 	$400,000    	$41,000
<br />   					Total Project Funding   	$930,940	($400,000)  	$530,940
<br />     			Appropriated for this project:
<br /> 										Current  	FY 2018-19       FY 2018-19
<br />       									FY 2018-19       Amendment 	Revised
<br />				Efland Sewer Extension Project   	$930,940	($400,000)  	$530,940
<br /> 							Total Costs   	$930,940	($400,000)  	$530,940
<br />      			Information Technologies Project (-$200,000) - Project #30007
<br />      			Revenues for this project:
<br /> 										Current  	FY 2018-19       FY 2018-19
<br />       									FY 2018-19       Amendment 	Revised
<br />				Alternative Financing     		$11,053,245	($200,000)      $10,853,245
<br />				From General Fund			$1,595,257   		$0       $1,595,257
<br />				Appropriated Fund Balance 		$200,000   		$0  	$200,000
<br />   					Total Project Funding       $12,848,502	($200,000)      $12,648,502