2 <br /> • removing and reworking all electrical components, <br /> • removing and replacing the existing heating and cooling system located on the roof, <br /> • installing new ductwork to the courtroom, jury room and Judge's Chamber, <br /> • replacing all contaminated flooring and cabinetry, <br /> • replacing the existing roof system with a new roof system, including all curbs and <br /> parapet walls, <br /> • reattaching the gutter system, <br /> • replacing and insulating roof drain piping, <br /> • installing a roof access ladder, <br /> • working with an engineer and architect to seal the design drawings for the roof <br /> replacement, and <br /> • obtaining all necessary permits and other documentation necessary to use the <br /> courtroom and adjacent spaces <br /> In emergency situations, the Board is authorized to bypass formal bid procedures by finding <br /> that an emergency condition is present that represents a threat to the health and safety of the <br /> people and their property. In this case, the mold growth and potentially hazardous indoor air <br /> quality in the courtroom represents such a health emergency. Staff is recommending that the <br /> Board make this finding to allow the scope of work to proceed expeditiously. This finding is <br /> included in the Manager's Recommendation. <br /> Since this project was not anticipated as part of the Capital Budget, a budget amendment is <br /> also necessary to finance this project. Staff recommends that the following funds be <br /> reallocated from existing projects to fund the remediation and reconstruction of the Battle <br /> Courtroom. This budget amendment provides for the reallocation of funds and amends the <br /> following Capital Project Ordinances: <br /> Efland Sewer Extension Project (-$400,000) - Project #30017 <br /> Revenues for this project: <br /> Current FY 2018-19 FY 2018-19 <br /> FY 2018-19 Amendment Revised <br /> Alternative Financing $291,654 $0 $291,654 <br /> From Other Projects $198,286 $0 $198,286 <br /> From General Fund $441,000 $400,000 $41,000 <br /> Total Project Funding $930,940 ($400,000) $530,940 <br /> Appropriated for this project: <br /> Current FY 2018-19 FY 2018-19 <br /> FY 2018-19 Amendment Revised <br /> Efland Sewer Extension Project $930,940 ($400,000) $530,940 <br /> Total Costs $930,940 ($400,000) $530,940 <br /> Information Technologies Project (-$200,000) - Project #30007 <br /> Revenues for this project: <br /> Current FY 2018-19 FY 2018-19 <br /> FY 2018-19 Amendment Revised <br /> Alternative Financing $11,053,245 ($200,000) $10,853,245 <br /> From General Fund $1,595,257 $0 $1,595,257 <br /> Appropriated Fund Balance $200,000 $0 $200,000 <br /> Total Project Funding $12,848,502 ($200,000) $12,648,502 <br />