Browse
Search
Item 8-g - Efland Sewer System - Transfer of Ownership to City of Mebane
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 12-03-2018
>
Item 8-g - Efland Sewer System - Transfer of Ownership to City of Mebane
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 2:48:10 PM
Creation date
11/29/2018 2:32:38 PM
Metadata
Fields
Template:
BOCC
Date
12/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-g
Document Relationships
Agenda - 12-03-2018 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 12-03-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br /> Attachment 2 <br /> Efland Sewer System Summary: <br /> • Approximately 11 .6 miles of gravity sewer <br /> • Approximately 1 .5 miles of publicly-maintained (5 3") service force mains <br /> • Approximately 4.2 miles of transmission force main to Mebane <br /> • 3 duplex pump stations <br /> • 3 publicly-maintained individual service pump stations <br /> SECTION PIPE SIZES/ CONST. <br /> PLAN NAME ENGINEER MATERIALS DATE <br /> EFLAND-CHEEKS HAZEN AND SEWER: 8" & 12" <br /> A TOWNSHIP SANITARY SAWYER ULTRA-RIB PVC 1989 <br /> SEWER FACILITIES FORCE MAIN: 10" PVC <br /> HANCOR, INC. — <br /> NORTH CAROLINA PLANT PHILLIP POST & FORCE MAIN: <br /> B SANITARY SEWER ASSOCIATES 2" PVC 1993 <br /> EXTENSION <br /> EFLAND ESTATES—CAIN COULTER HART SEWER: 8" PVC <br /> C DRIVE IMPROVEMENTS JEWELL THAMES FORCE MAIN: 1997 <br /> 1997 2"SCHEDULE 80 PVC <br /> BARBER & ROSS CIVIL FORCE MAIN: <br /> D SANITARY SEWER CONSULTANTS 3" PVC 1999 <br /> E RICHMOND HILLS KIMLEY-HORN AND SEWER: 2002 <br /> ASSOCIATES 8" SDR-35 PVC <br /> ASHWICK SUBDIVISION— PHILLIP POST & SEWER: <br /> F PHASE 1 ASSOCIATES SDR-35 PVC 2002 <br /> ASHWICK SUBDIVISION— PHILLIP POST & SEWER: <br /> G PHASE 2 ASSOCIATES SDR-35 PVC 2006 <br /> COULTER JEWELL SEWER: <br /> THAMES (DESIGN); 8" PVC & 8" DIP, <br /> EFLAND SANITARY SEWER McGILL DEPENDING ON <br /> H IMPROVEMENTS 2007 ASSOCIATES— DEPTH OF BURY 2013 <br /> (CONSTRUCTION FORCE MAIN: <br /> ENGINEERING & 8" DIP <br /> INSPECTION) <br /> I McGOWAN INTERCEPTOR McGILL SEWER: 2014 <br /> ASSOCIATES 12" DIP <br /> TINNIN WOODS SUMMIT DESIGN SEWER: <br /> J SUBDIVISION AND ENGINEERING 8" PVC 2014 <br /> SERVICES <br /> HOBBS UPCHURCH SEWER: <br /> (PARTIAL DESIGN); 12" SDR-35 PVC & 12" <br /> ELFAND SEWER TO McGILL CL. 50 DIP, <br /> K MEBANE - PHASE 2 ASSOCIATES DEPENDING ON 2018 <br /> EXTENSION (FINAL DESIGN AND DEPTH OF BURY <br /> CONSTRUCTION FORCE MAINS: <br /> ENGINEERING & 10" & 12" C900 PVC <br /> INSPECTION <br /> NOTES: (1) SEE COLOR-CODED ATLAS(NOT A PART OF THESE TRANSFER DOCUMENTS) <br />
The URL can be used to link to this page
Your browser does not support the video tag.