Browse
Search
Item 8-e - Award of Blackwood Farm Park Professional Services Agreement
OrangeCountyNC
>
BOCC Archives
>
Agendas
>
Agendas
>
2018
>
Agenda - 12-03-2018
>
Item 8-e - Award of Blackwood Farm Park Professional Services Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/29/2018 2:47:54 PM
Creation date
11/29/2018 2:31:59 PM
Metadata
Fields
Template:
BOCC
Date
12/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-e
Document Relationships
Agenda - 12-03-2018 Regular Board Meeting
(Message)
Path:
\BOCC Archives\Agendas\Agendas\2018\Agenda - 12-03-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10 <br /> 6.2.1 If the Designer's work on the Project is or will be delayed for more than sixty(60) days through no fault of the Designer, or if the <br /> Owner increases or decreases the scope or size of the Project by ten percent(10%) of currently estimated Total Project Cost,the <br /> Designer shall give prompt written notice to the Owner. Provided that such notice has been given,the Designer may request in writing <br /> an adjustment in the Key Milestone Listing dates, which shall be granted by the Owner to the extent reasonable. <br /> ARTICLE 7 <br /> DESIGNER'S COMPENSATION <br /> 7.1 Compensation for Basic Services <br /> 7.1.1 Compensation for Basic Services shall include all compensation due the Designer from the Owner for all services under this <br /> Agreement. <br /> 7.2 Breakdown of Compensation for Basic Services <br /> Not-to-exceed Compensation for Basic Services consists of the following compensation for the following separate categories of services: <br /> 7.2.1 Schematic Design Phase. Lump Sum (Insert Lump Sum or Time and Materials as appropriate)fee of$70,495. <br /> 7.2.2 Design Development Phase. Lump Sum fee of$42,609. <br /> 7.2.3 Construction Document Phase. Lump sum fee of$58,059. <br /> 7.2.4 Bidding and Contract Award. Lump sum fee of$9,976. <br /> 7.2.5 Construction Phase. Lump sum fee of$53,056. <br /> 7.2.6 Post Construction Phase. Lump sum fee of$10,565. <br /> 7.2.7 Additional Basic Services (Select all that apply): <br /> fee of <br /> fee of <br /> fee of <br /> fee of <br /> 7.3 Payment for Basic Services Rendered, as described in Attachment B <br /> 7.3.1 Payment to the Designer for Basic Services shall become due and payable as progress deliverables and categories of services are <br /> completed. Upon completion of each category, payment will be made by the Owner within 30 calendar days of receipt of an invoice <br /> which is in form and substance acceptable to the Owner. When applicable such invoice shall include supporting documentation, as <br /> designated by Owner,for any reimbursable expenses claimed by Designer. In the event the Owner finds any part or parts of all or any <br /> portion of an invoice presented by the Designer not to be acceptable, it shall identify to the Designer the part or parts which are not <br /> acceptable and shall pay the part or parts of the invoice which are acceptable, if any. This paragraph is not intended to indicate Owner <br /> 7 <br /> Revised 10/17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.