Orange County NC Website
ORANGE COUNTY <br />BOARD OF COMMISSIONERS <br />ACTION AGENDA ITEM ABSTRACT <br />Meeting Date: May 17, 2005 <br />Action Agenda <br />Item No. ~_~_ <br />SUBJECT: Bid Award: Blasting Services for Landfill <br />DEPARTMENT: Purchasing & Solid Waste <br />Management <br />PUBLIC HEARING: (Y/N) Na <br />ATTACHMENT(S): <br />Tabulation <br />Safety Plan <br />INFORMATION CONTACT: <br />Pam Jones, 245-2652 <br />Gayle Wilson, 968-2885 <br />TELEPHONE NUMBERS: <br />Hillsborough 732-8181 <br />Chapel Hill 968-4501 <br />Durham 688-7331 <br />Mebane 336-227-2031 <br />PURPOSE: To consider awarding a contract for blasting at the Orange County Landfill from <br />Mid South Drilling, Inc, of Mocksville, North Carolina. <br />BACKGROUND: A sedimentation pond is being constructed at the Orange County Landfill to <br />serve as a staging area far runoff from the new construction and demolition (C&D) landfill. The <br />pond was constructed utilizing County owned and operated equipment, Currently, there is an <br />estimated 1,760 cubic yards of large boulders and bedrock that the Solid Waste Department is <br />not equipped to remove, This material will need to be reduced in size by blasting, Rock debris <br />from blasting will be na larger than 2 feet in diameter (most chunks probably will be 1 foot or <br />less). Staff will utilize the material on site to construct erosion control barriers, <br />Orange County staff developed specifications as part of bid solicitation 1431. This bid was sent <br />to five contractors and advertised on the County website, Two Contractors attended a pre bid <br />conference at the jobsite, Mid South Drilling, Inc, of Mocksville, North Carolina submitted the <br />only bid received at a cost of $23.30 per cubic yard (estimated total cost of $41,008). <br />The safety plan to be followed by Mid South is attached. Solid Waste Management staff have <br />been advised by the proposed contractor that blasting effect and noise are likely to be minimal, <br />However, staff will closely monitor the process and advise landfill neighbors of blasting activities <br />if circumstances warrant, <br />FINANCIAL IMPACT: The estimated cost of the blasting is $41,008. Sufficient funds were <br />allocated within the FY 2004-2005 Solid Waste budget to cover the cost of the service. <br />RECOMMENDATION(S): The Manager recommends that the Board award the bid to Mid <br />South Drilling, Inc, of Mocksville, North Carolina at a cost of $23,30 per cubic yard (estimated <br />total cost of $41,008), and authorize the Purchasing Director to execute the necessary <br />paperwork. <br />