Browse
Search
2018-743-E AMS - Boomerang Design 510-Waters Assessment
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-743-E AMS - Boomerang Design 510-Waters Assessment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/25/2019 4:15:44 PM
Creation date
11/26/2018 11:30:24 AM
Metadata
Fields
Template:
Contract
Date
10/18/2018
Contract Starting Date
10/18/2018
Contract Document Type
Agreement - Consulting
Amount
$25,000.00
Document Relationships
2019-147-E AMS - Boomerang ES Change Request 1
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-743 AMS - Boomerang Design 510-Waters Assessment
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:200BF5BF-439F-4591-A664-7248B1AB5C64 <br /> Boomerang DESIGN <br /> Page 2 of 3 <br /> Letter to: J.Thompson <br /> October 17, 2018 <br /> Initial Thoughts <br /> Although North Carolina first implemented it's own Energy Conservation Code in 2006 and continued with <br /> updates in 2009 and 2012, it wasn't until the 2018 NC Energy Conservation Code (mandatory implementation <br /> January 1, 2019)that the need for air barriers as a code requirement.This code now requires that all new <br /> commercial buildings in zones other than 1-3 include a continuous air barrier.The air barrier limits the amount <br /> of air permeability leakage into buildings through the building envelope. Because this building was constructed <br /> prior to the code requirement, and in all honesty, before anyone knew about the need for such, it is unlikely that <br /> any air barrier was installed. <br /> Why is an air barrier important?Wherever air moves, water vapor can follow. Proper air sealing reduces the risk <br /> of water vapor moving into the wall system where prolonged exposure can result in moisture issues such as <br /> wood rotting and mold, which can cause expensive structural or health problems. Air leakage has the ability to <br /> transport exponentially more moisture into and through the building enclosure than occurs through vapor <br /> diffusion alone. Air barriers are systems of materials designed and constructed to control airflow between a <br /> conditioned space and an unconditioned space.The air barrier system is the primary air enclosure boundary that <br /> separates indoor(conditioned) air and outdoor(unconditioned) air. Air and moisture molecule infiltration <br /> through a building's exterior envelope is now known to have the ability to bring significant unwanted moisture <br /> into the building. are known to Because of the existing building construction materials and in order to reduce <br /> the moisture levels in the building, it will be necessary for the selected design team to study and propose <br /> methods to provide such air barrier in the conditioned space of the building. <br /> Scope of Services <br /> Boomerang Design will coordinate with REI Engineers (building envelope consultant) and Progressive Design <br /> Collaborative (mechanical engineer) to study and develop a report with recommendations and budget costs for <br /> remediation. We propose a not to exceed $25,000 billed as an hourly rate cost based upon the attached rate <br /> sheet and consultant proposals. Our not to exceed number is based upon the below steps: <br /> Progressive Design Collaborative (see attached) <br /> REI Engineers (see attached) <br /> Boomerang Design - Principal level administration <br /> • Review of County's Industrial Hygienist Report—1 hour <br /> • Conference Call with entire team, Owner and Hygienist to discuss initial thoughts/plans for destructive <br /> demolition—1 hour <br /> • One (1) day on site for destructive demolition oversight and analysis—8 hours <br /> • Conference Call with entire team, Owner and Hygienist to discuss results of destructive demolition and <br /> next steps— 1 hour <br /> • Analysis of options, discussion with vendors for remediation—16 hours <br /> • Conference Call with the Owner and team to discuss analysis options—2 hours <br /> • Preparation of a findings and recommendations report—8 hours <br /> • Preparations of Budget Pricing and discussion with vendors—8 hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.