Browse
Search
Agenda - 08-17-2004-9c
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 08-17-2004
>
Agenda - 08-17-2004-9c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:20:47 PM
Creation date
8/29/2008 10:23:33 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2004
Document Type
Agenda
Agenda Item
9c
Document Relationships
Minutes - 20040817
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
RES-2004-063 Phase One DAVI-NET - Preliminary Plan Resolution
(Linked From)
Path:
\Board of County Commissioners\Resolutions\2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OR <br />A letter of credit, escrow agreement, or bond shall be submitted to secure <br />construction of Egg Lane and Suze Drive to the standards of the North Carolina <br />Department of Transportation. An estimate of the construction cost must be <br />prepared by a certified/licensed engineer or grading contractor and submitted to <br />the Planning and Inspections Department. The financial guarantee must reflect <br />110% of that estimate and be issued by an accredited financial institution <br />licensed to do business in North Carolina. <br />The document describing development restrictions to be recorded with the Final <br />Plat shall state that the financial guarantee will not be released until the road <br />construction has been inspected and approved by NCDOT. <br />All lots shall receive access from the internal subdivision roads. No driveways <br />shall be permitted within 50' of a street intersection. <br />Contemporaneously with the construction of Egg Lane a temporary turnaround <br />shall be constructed within the right of way of the stubout area at the south end <br />of Egg Lane to North Carolina Department of Transportation standards as <br />provided for in B.1 above. <br />An erosion control plan for construction of the roads shall be submitted by the <br />applicant to the Orange County Erosion Control Division for review and <br />approval prior to any land disturbing activity on the site. <br />5. Approved double bladed street name signs shall be erected at all intersections <br />prior to Planning Department signatures on the final plat. <br />Prior to any construction or alteration of any existing access within the right-of- <br />way of Old N.C. 10, the developer/owner shall secure a driveway permit from <br />the NCDOT District Office. Submit a copy of the NCDOT- approved permit <br />and letter to the Planning Department at the same time as the request for <br />Planning Department signatures on the Final Plat. <br />7. Sight triangles (10' x 70') shall be shown on the Final Plat at each intersection. <br />8. Dedicate in fee simple, 5' additional right-of-way or 35 feet from the centerline <br />of the existing right-of-way, whichever is greater, along Mt. Hermon Church <br />Road and along both sides of Old N.C. 10 to meet collector roads right-of-way <br />standards as identified in the Comprehensive Plan and required in Section IV-B- <br />3-c-1 of the Subdivision Regulations. <br />C. Land Use Buffers and Landscaping <br />Landscaping shall be installed and preserved to meet the requirements of Section <br />IV-B-8-d-1, and must be inspected and approved by the Planning and <br />Inspections Department prior to signatures on final plat. Landscaping shall be <br />placed behind the sight triangles at intersections. <br />
The URL can be used to link to this page
Your browser does not support the video tag.