Browse
Search
Agenda - 08-17-2004-9b
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 08-17-2004
>
Agenda - 08-17-2004-9b
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:20:56 PM
Creation date
8/29/2008 10:23:32 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2004
Document Type
Agenda
Agenda Item
9b
Document Relationships
2004 S Purchasing- Southern Orange Senior Center Architect Gurlitz Architects
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20040817
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pence and Associates/Structural Engineering; and Sigma/Plumbing, Mechanical and Electrical <br />Engineering. <br />The project design will employ sustainable design/greenbtailding elements, with which the <br />Gurlitz team has significant experience. It is notable that the scope of work for Sigma includes <br />a commissioning of the mechanical, electrical and plumbing systems on the building to ensure <br />operation of is commensurate with the design intent. This work is generally accomplished <br />through a separate contract, which will now be unnecessary far this project. <br />A modification of the existing Special Use Permit (SUP) will be required for this project. The <br />estimated time to complete this process is customarily 9-12 months, however, owners of public <br />projects may request expedited review and reduce the time needed. Note that no part of the <br />process is circumvented by expedited review, however, it does allow the project to move <br />through the process faster in that it is required to be reviewed by staff as a priority item and is <br />set first on the Council's agenda, It is recommended that the Board direct the Manager to <br />request an expedited review far this project. The architect has estimated aten-month <br />construction time for the building. <br />FINANCIAL IMPACT: <br />The fees for design services have been proposed as follows: <br />• Basic Design Services from programming through project closeout,...,.,.,.,.$290,000 <br />• Special Use Permitting and Site Development Fee .................................. 32 000 <br />Total Fees ...........................................................................$322,000 <br />The project budget is stated at $3,000,000 and will be funded through a combination of <br />proceeds from the 2000 Bond ($2,000,000) and Alternative Financing ($1,000,000), <br />RECOMMENDATION(S): The Manager recommends that the Board: <br />Accept the recommendation of the Southern Orange Senior Center Architect Selection <br />Panel to retain Gurlitz Architects for the design of the Center; and <br />• Approve a contract, contingent upon attorney and staff review, in an amount not to exceed <br />$322,000 as outlined in the attached cost proposal from Gurlitz; and <br />Authorize the Chair to sign on behalf of the Board; and <br />• Direct the Manager to request Expedited Review of the project from the Town of Chapel <br />Hill. <br />
The URL can be used to link to this page
Your browser does not support the video tag.