Browse
Search
Agenda - 08-17-2004-9a
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2000's
>
2004
>
Agenda - 08-17-2004
>
Agenda - 08-17-2004-9a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2008 5:21:13 PM
Creation date
8/29/2008 10:23:31 AM
Metadata
Fields
Template:
BOCC
Date
8/17/2004
Document Type
Agenda
Agenda Item
9a
Document Relationships
2004 S Purchasing - Corley Redfoot Zack Inc & Orange County for Parks Operation Base & Storage Facility
(Linked From)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2000's\2004
Minutes - 20040817
(Linked To)
Path:
\Board of County Commissioners\Minutes - Approved\2000's\2004
ORD-2004-104 - Parks Operations Base and County Storage Facility Capital Project Ordinance
(Linked From)
Path:
\Board of County Commissioners\Ordinances\Ordinance 2000-2009\2004
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />Vls. Pamelei K. tones A.s{;ust 1G, 20{)4 <br />I?E: Orange Cnunty Parks P'Kc'' <br />BASIC SlIZVICE5: <br />~lhs~ fee fi7r Ei~tiic Sert~ic`,es, includutg the ~It~cvn cxi Hs11sL~<~rou},h approeal process ss `~h,Qilf'. <br />Basic Scrt~ices consi4t of the: fo3lowing: <br />Ard;itectural design <br />Civil [aiginee~ring design <br />Structural Eingineerinl; design <br />IIY yCITk~dn~al;'I'Iumbvtg dESlim <br />Construction ~ldrnini~tration {l;a,rc `xs~ri~cs provida<, one risit per tceck t,, tl~c proje~et dsrnng tno <br />cvnstruction period. fidd~tional site ~~isits are ~tonsidered Adc3sts~~na1 Services,) <br />Corie~< Itedfoat Lack, Inc., is pleased to yrot°ide deSTgn services fors' your project. 'the c~'ork ~vi1t tie <br />prs7duced as ontlined beloi .The crnlsultants listed hate titiorked tiuith us sm similar proiecks, and <br />slur strong working relationship teill benefit roar protect. <br />Corlec hedfoot Zack, Inc.: Civil Engineering:~sx1 Architecture <br />Reece, L~oletnd c'Sc i~'iclarath, Inc: Nlechamcal j E'iet~tricallP7tmibing Isnglnecring <br />L<v5ater~ilopkins~Chang, PC: Strndurat Enginceris7g <br />PROJECT BUDGET SUIV1141ARY: <br />171c C>e.~aigner'S us7derstandin~ {,f the overall brsdg¢t for the proj6rct is as Eollssru: <br />Censtrnction: f3tiilciing and Sitework S:;~C3C16 ~ 6~Ot000~ ~{~~ <br />Contingency: Ifi,00t) <br />~5 000 ~ PJ <br />H11l,borough 4~raterJSev1`er Fees: j11,~HtT ~ <br />Professional I~esil*n Se~rls~e Feet: ~>,(1{10 <br />Testing, '4liscc(!<~neous l~ecs end Pernsits: 9 ili)0 <br />I'<rtal Project Budget: tifiiS,()0() <br />'The proposed schedule indicates that occlspancy should be na later than Jule 31, 2Op?. bawud <tt7 <br />information gathered to-date, this schedule is "do-able". PIea,c note that thca L?e4rkner's absiztl° h" <br />adhexe to this schedule iLs prt:dic~ated upon timely rs;ceipt c>f recxnvs and apprn•a1s £rom the Owner; <br />autlu~rized agencies of the Owner, and k7ca1 and stat< agencies haring; jurisdickdon otss' the prr<ject. <br />SERVICES NOT INCLUDED: <br />L:el;al fires <br />Geerytecl5niaal investi+vatcrn <br />rox~n pernuttn~g or appttieal procs~ys tees <br />Renderings ar sxiodels <br />~~~ <br />w a ~ C[7;21-bY IZ:'~tt 3C <7 ZAt K.,;. <br />
The URL can be used to link to this page
Your browser does not support the video tag.