Orange County NC Website
The consultant will provide costs of construction so that estimated building(s) <br />size may be calculated. The storage space added is likely to range from <br />approximately 4,000 to 6,000 square feet, assuming a $50-$75/square foot <br />construction cost. However, the consultant cautioned that the rising cost of <br />steel and cement may adversely impact the square footage cost of <br />construction. <br />• While there is a need for departmental records storage, the more critical <br />unmet need seemed to lie in the need for climate controlled storage space in <br />which to house institutional equipment (e.g. voting machines, EMS/Homeland <br />security supplies). <br />• In tandem with this project, possibilities for reallocation/improvements within <br />existing storage areas will be explored to meet departmental records storage <br />needs that the new building will not likely be able to address in this phase of <br />development. <br />• Both the storage facility and the operations base are likely to utilize pre- <br />engineered buildings. The consultant will design the project such that both <br />facilities can be expanded by the addition of other pre-engineered structures. <br />This will allow the most efficient use of the budgeted funds at this time, as well <br />as will provide opportunities for expansion as future funding allows. <br />• The group agreed to recommend that the Board accept the attached design <br />proposal from CRZ and exempt the project from the qualifications based <br />architect selection process as allowed by statute. <br />Information regarding progress of the design will be provided to the Board at milestones of the <br />project. Commissioner Halkiotis will continue to work with the planning group throughout the <br />design process. <br />Pursuant to Board action on June 23, 2004, a surveyor has been retained and is at this time <br />preparing the survey information needed for the project. <br />FINANCIAL IMPACT: The total project budget for these two facilities is $675,000 and is being <br />funded from 2/3 Net Debt Reduction Bonds as recently approved by the Board. The breakdown <br />of cost centers as provided by CRZ, the proposed architect, are as follows: <br />• Construction Building and Sitework: $600,000 <br />• Contingency $16,000 <br />• Hillsborough Water/Sewer Fees $5,000 <br />• Professional Design Services Fees $45,000 <br />• Testing, Misc. Fees and Permits 9 000 <br />Total Project Budget $675,000 <br />A capital project ordinance is attached. <br />RECOMMENDATION(S): The Manager recommends that the Board take the following action: <br />1. Endorse the development direction of the project as cited above; and <br />2. Exempt this project from the qualification-based selection process for architect services <br />as allowed by GG 143-64.32 and award a contract to Corley Redfoot Zack in an amount <br />not to exceed $45,000 for the design services for this contract; and authorize the Chair to <br />sign on behalf of the Board. <br />3. Approve a capital project ordinance appropriating $675,000 to the project. <br />