Orange County NC Website
22 <br /> <br />Proposed solution: <br />• Raise the elevation of Pettigrew Street approximately 7 feet at its intersection with <br />Mangum Street. Mangum Street would transition back to its existing elevation south of <br />Vivian Street. <br /> <br />Blackwell Street <br />Design considerations: <br />• Enhance safety and pedestrian access for a downtown crossing in great need of <br />improvement. <br />• Avoid impact to historical landmark. <br />Proposed solution: <br />• Close the existing Blackwell Street railroad crossing to vehicle traffic. <br />• Work closely with the community to evaluate an alternative connection near Blackwell <br />Street, most likely in the form of a bicycle and pedestrian bridge. <br /> <br />Dillard Street <br />Design considerations: <br />• Acknowledge existing traffic patterns. <br />• Mitigate ways current railroad operations pose challenges to vehicle, pedestrian and <br />light-rail traffic. <br /> <br />Proposed solution: <br />• Convert Dillard Street to one-way southbound between Ramseur and Pettigrew streets <br />to improve light rail and existing freight rail operations. <br /> <br />Downtown Loop (Ramseur Street) <br />Design considerations: <br />• Acknowledge existing traffic patterns, other vehicle access changes to Blackwell Street. <br />• Adhere to city’s existing downtown loop plan. <br />Proposed solution: <br />• Change Ramseur Street to two-way travel between Chapel Hill Street and Dillard Street <br />to improve vehicle and bus access in the westbound direction. This conversion aligns <br />with the City of Durham’s adopted plan to convert the entire loop. <br /> <br />Alston Avenue/ NCCU <br />Design considerations: <br />• Enhance safety and pedestrian access for nearby affordable housing residents and <br />North Carolina Central University. <br />• Limit potential conflicts with vehicle traffic. <br />Proposed solution: <br />• Replace large park-and-ride structure at Alston Avenue with at-grade parking spaces. <br />• Move the Alston Avenue station platform closer to the intersection of Pettigrew and <br />Grant streets to improve pedestrian access. <br />• Improve sidewalks and lighting at both station areas. <br /> <br />Rail Operations and Maintenance Facility <br />• GoTriangle seeking rezoning with a development plan, Future Land Use Map <br />amendment and annexation. <br />• Planning Commission hearing Oct. 9; Durham City Council action in December. <br />