Orange County NC Website
19 <br /> <br />• Incorporate recent advancements in Intelligent Transportation System (ITS) technologies <br />at intersections. <br /> <br />Requested Action <br />The Manager recommends to BOCC: <br />• Receive the presentation (Attachment 1); <br />• Discuss as appropriate; and <br />• Identify any comments the Board may have for staff to convey to DCHC MPO. <br /> <br />Commissioner Marcoplos said Park and Ride lots were heavily discussed at the <br />Metropolitan Planning Organization (MPO), but he does not see them strongly recommended <br />here. He urged the Board of County Commissioners to make the Park and Ride lots a priority. <br />He said there is a UNC facility on Hwy 54, with a lot of land around it, and suggesting working <br />with them. He said it could be a gravel lot, and does not need to be fancy. <br />Commissioner Marcoplos referred to the Bus Rapid Transit (BRT) idea, and said, if it is <br />going to be done, it should be done soon since a lot of transit projects are planned for the <br />future, but are almost too little too late once finally completed. <br />Commissioner McKee endorsed Commissioner Marcoplos comments, and said the key <br />is to get ahead of the curve, as growth will only increase. <br />Commissioner Price agreed with Commissioner Marcoplos and Commissioner McKee. <br />She asked if bikes will be included in this plan. <br />Nishith Trivedi said yes. <br />Commissioner Price asked if there is a plan for stormwater. <br /> Craig Benedict said if there is curb and gutter, it is piped to areas where there are <br />existing streams. He said before it is released into a stream, stormwater devices must be put in. <br />He said it is a major engineering endeavor, and would greatly increase the project cost. <br /> Commissioner Price clarified that the numbers presented do not include these costs. <br /> Craig Benedict said the numbers probably include a middle of the road cost estimate, <br />and real costs will likely be higher. <br />Commissioner McKee said the curb and gutter act like a collection system that is piped <br />into disperser pads or retention ponds. <br />Commissioner Price said this was not reflected in the PowerPoint, and will likely <br />increase the projected costs. <br />Commissioner Price said she liked to listen to Carrboro residents’ comments, and she <br />would like to see more reduction of traffic on this road, as well as greater use of Park and Ride <br />lots. <br />Commissioner Rich referred to b-2 and c-2, and asked if there is only a sidewalk on one <br />side of Highway 54. <br />Nishith Trivedi said yes that is correct. <br />Commissioner Rich asked if it is known how far one would have to walk to reach an <br />intersection to cross the road to the sidewalk. <br />Nishith Trivedi said each of these proposed intersections has a pedestrian crosswalk. <br />Commissioner McKee asked if the intersections are signalized. <br />Nishith Trivedi said most, but not all of them. <br />Commissioner Rich referred to the OUTBoard comments, who want to see more <br />coordination of all the transit partners, and asked if those discussions are included at the MPO <br />and other meetings. <br />Nishith Trivedi said yes. <br />Commissioner Rich asked if public transit would stop at the Park and Ride lots. <br />Nishith Trivedi said this would be recommended as part of the study. <br />