Browse
Search
OUTBoard agenda 101718
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2018
>
OUTBoard agenda 101718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 4:06:43 PM
Creation date
11/13/2018 4:06:04 PM
Metadata
Fields
Template:
BOCC
Date
10/17/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 101718
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
224 <br />Nish Trivedi: I will find out from the consultant and get back to you. 225 <br /> 226 <br />Heidi Perry: It would be good to know what the people thought who were trying to get out and then the people already on 227 <br />54. You will let us know? 228 <br /> 229 <br />Alex Castro: One traffic light has been added at Mebane Oaks Rd, that is far out. Play chicken crossing 54. 230 <br /> 231 <br />Heidi Perry: Report on 54? 232 <br /> 233 <br />Nish Trivedi: It has been pushed out another month. I will keep you informed. I will be presenting to you for your 234 <br />comments in November. 235 <br /> 236 <br />Alyson West: When is STIP? 237 <br /> 238 <br />Nish Trivedi: Should be done in January or February. I think they pushed it out for another month due to the hurricane. 239 <br /> 240 <br />Alyson West: Are we going to see it again? 241 <br /> 242 <br />Nish Trivedi: Yes. Right now we are working on Division Points and pursuing local points on projects you recommended 243 <br />get priority. OCPT’s 2 transit vehicles and Old Greensboro road. There is a chance NC 86 going north of Hillsborough to 244 <br />NC 57 widening and intersection improvements getting funded if other division projects don’t. The Old Greensboro Rd. 245 <br />was too high of a cost and will not get funded. 246 <br /> 247 <br />Alex Castro: They did put in a new Bridge on Old Greensboro Rd. east of the Edwards property, west of Jones Ferry Rd 248 <br />and that permits bicyclists to be on the road at the bridge when someone is coming, just wide enough I would say. It 249 <br />does have a shoulder to it. 250 <br /> 251 <br />Nish Trivedi: Right now, State projects and Regional projects have been determined. Right now you can go to NCDOT 252 <br />STIP process and see the results, both with a map as well as the spread sheet which shows you the projects across the 253 <br />state that have gotten Statewide and Regional Funding and the draft of the Division. 254 <br /> 255 <br />Heidi Perry: So, when you said we did not make a recommendation for 54 it didn’t get points but that’s the same 54 you 256 <br />are going to be reporting on in October or November? 257 <br /> 258 <br />Nish Trivedi: Yes. There are several NC 54 projects in the STIP. There is the Old Fayetteville Rd and 54 intersection 259 <br />improvement, Carrboro doesn’t want that one. 260 <br /> 261 <br />Alex Castro: The development of the Lloyd Property. 262 <br /> 263 <br />Nish Trivedi: Another NC-54 project from Orange Grove Road to Old Fayetteville Rd, the Operation Improvement project 264 <br />is already funded, so they are doing that project. The widening of that same portion of NC-54 was not recommended for 265 <br />points so it did not get funded. They are also waiting for the corridor study to be done. It is the 3rd highest scoring 266 <br />Regional Project in Division 7. Just letting you know the results of the Regional Project. If it received local points it would 267 <br />have been done because NCDOT division did put points on it. 268 <br /> 269 <br />Heidi Perry: Whether we wanted it or not. 270 <br /> 271 <br />Nish Trivedi: If it was recommended as one of the top 2 Orange County priorities in TARPO and it had gotten the local 272 <br />input points. Division 7 put the points on it because they thought it was a great project and the study was almost 273 <br />complete. The study would have been completed before the draft STIP went out for review. We did not put points on it in 274 <br />either MPO or RPO so it’s not getting done. There is the other NC 54 widening project from Orange Grove Road to NC-275 <br />119 in Alamance County. BGMCO submitted this project to NCDOT. BGMPO, I believe put points on it but nobody else 276 <br />did therefore it did not get funded, that I am aware of. I will show you the results when the draft STIP is released. The 277 <br />only project that has as chance for funding is NC 86 north of Hillsborough from 70 to NC 57, widening and improving the 278 <br />intersection. 279 <br />7
The URL can be used to link to this page
Your browser does not support the video tag.