Browse
Search
OUTBoard agenda 101718
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2018
>
OUTBoard agenda 101718
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 4:06:43 PM
Creation date
11/13/2018 4:06:04 PM
Metadata
Fields
Template:
BOCC
Date
10/17/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 101718
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />B-4962 <br />40174.1.1 <br />40174.2.1 <br />40174.3.1 <br />Replace Bridge #46 over Eno river on US 70 Bypass 4/16/2019 FY 2021 $5,826,000 Planning and Design activities <br />underway, ROW acquisition <br />underway <br />Kevin Fischer <br />W-5707C <br />44853.1.3 <br />44853.3.3 <br />47490 <br />Revise pavement markings and overhead lane use signs for <br />removal of inside lane drop configuration on I-40 <br />Westbound in vicinity of US 15-501 interchange. <br />Resurfacing I-40 WB by use of contingency funds <br />6/30/2019 Aug. 2019 $395,000 Planning and design activities <br />underway, re-let due to bids <br />exceeded engineers estimate, new <br />let date pending - tentative June <br />2019 <br />Chad Reimakoski <br />P-5701 <br />46395.1.1 <br />46395.3.1 <br />Construct Platform, Passenger Rail Station Building at <br />Milepost 41.7 Norfolk Southern H-line in Hillsborough <br />6/30/2021 FY2022 $7,200,000 PE funding scheduled 7/1/2020, <br />Coordinate with U-5848 <br />Matthew Simmons <br />R-5821A <br />47093.1.2 <br />47093.2.2 <br />47093.3.2 <br />Construct operational improvements including <br />Bicycle/Pedestrian accommodations on NC 54 from SR <br />1006 (Orange Grove Road) to SR 1107 /SR 1937 (Old <br />Fayetteville Road). <br />6/21/2022 FY2024 $3,924,000 Planning and design activities <br />underway, coordinating with NC54 <br />West Corridor Study <br />Jennifer Evans <br />U-5848 <br />50237.1.1 <br />50237.2.1 <br />50237.3.1 <br />Extend SR 1006 (Orange Grove Road) on new location with <br />Sidewalks and bike lanes from existing SR 1006 (Orange <br />Grove Road) to US 70 Business in Hillsborough. <br />3/21/2023 FY 2025 $5,326,000 Planning and Design activities <br />underway, Coordinate with P-5701 <br />and U-5845 <br />Laura Sutton <br />I-3306AC <br />34178.1.6 <br />34178.2.5 <br />434178.3.9 <br />Interchange improvements at I-40 and NC86 in Chapel Hill 3/21/2023 FY 2025 $16,500,000 Planning and Design activities <br />underway <br />Laura Sutton <br />I-5959 <br />45911.1.1 <br />45911.3.1 <br />Pavement Rehabilitation on I-85 from West of SR 1006 <br />(Orange Grove Road) to Durham County line <br />11/21/2023 FY 2025 $11,155,000 Funding approved 10/10/17 Chris Smitherman <br />I-5967 <br />45917.1.1 <br />45917.2.1 <br />45917.3.1 <br />Interchange improvements at I-85 and SR 1009 (South <br />Churton Street) in Hillsborough <br />1/16/2024 FY 2027 $20,700,000 Planning and Design activities <br />underway <br />Laura Sutton <br />28
The URL can be used to link to this page
Your browser does not support the video tag.