TIP/WBS # Description Let/Start <br />Date <br />Completion <br />Date Cost Status Project Lead <br />SS-4907BS <br />44894.2.1 <br />44894.3.1 <br />Installation of traffic signal at the intersection of US70 and <br />SR 1114 (Buckhorn Road) East of Mebane. <br />5/31/2017 Dec. 2018 $40,500 R/W <br />$43,200 CON <br />Utility relocations complete, R/W <br />acquisition pending, right of entry <br />complete <br />Dawn McPherson <br />W-5707A <br />44853.1.1 <br />Curb ramp improvements at the following intersections: SR <br />2048 (South Road) at Raleigh Street; SR 2048 (South <br />Road) at Country Club Road, SR 1902 (Manning Drive) at <br />Paul Hardin Drive, and SR 1902 (Manning Drive) at Ridge <br />Road / Skipper Bowles Road in Chapel Hill <br />6/21/2018 Aug. 2018 $80,000 Signal pedestrian improvements <br />complete. Re-let and awarded to <br />Little Mountain Builders of Catawba <br />County, Inc. <br />Chad Reimakoski <br />R-5821B <br />47093.1.3 <br />47093.2.3 <br />47093.3.3 <br />Intersection improvements at NC54 and SR 1006 (Orange <br />Grove Road) <br />6/21/18 FY2019 $820,000 Utilities complete, ROW certified, <br />Project let and awarded to Fred <br />Smith Company <br />Brian Ketner <br />U-5846 <br />50236.1.1 <br />50236.2.1 <br />50236.3.1 <br />Construct a roundabout at SR 1772 (Greensboro Street) <br />and SR 1780 (Estes Drive) in Carrboro. <br />6/28/2018 FY 2020 $775,000 Utility coordination underway, R/W <br />certified with delay of entries, Project <br />let and received no bids, Re-let <br />TBD <br />Chad Reimakoski <br />U-5854 <br />46382.1.1 <br />46328.2.1 <br />46382.3.1 <br />Construct a roundabout at SR 1008 (Mt. Carmel Church <br />Road) and SR 1913 (Bennett Road) in Chapel Hill <br />6/28/2018 FY 2020 $775,000 Utility coordination underway, R/W <br />certified, Project let and awarded to <br />Carolina Sunrock, LLC <br />Chad Reimakoski <br />47798 Increase length of existing turn lane / slip ramp and <br />improve existing radius in the SE quadrant of US 70 <br />Business/ NC 86 at US 70 Bypass in Hillsborough <br />Dec. 2018 Jun. 2019 $189,000 Planning and design activities <br />underway - 25% plans under review <br />Chad Reimakoski <br />I-5822 <br />50465.1.1 <br />50465.3.1 <br />Pavement Rehabilitation on I-40 from I-85 to East of SR <br />1734 (Erwin Road) <br />1/15/2019 FY 2020 $12,450,000 Planning activities pending Chris Smitherman <br />U-5847 <br />50238.1.1 <br />50238.2.1 <br />50238.3.1 <br />Intersection improvements at SR 1010 (West Franklin St.) <br />and SR 1771 (Merritt Mill Rd)/SR1927 (Brewer Lane) in <br />Chapel Hill / Carrboro. <br />1/17/2019 FY 2020 $775,000 Planning and design activities <br />underway <br />Chris Smitherman <br />NCDOT DIV 7 PROJECTS LOCATED IN DCHCMPO - UNDER DEVELOPMENT <br />Item 6.a. <br />27