Browse
Search
OUTBoard agenda 091918
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange Unified Transportation Board
>
Agendas
>
2018
>
OUTBoard agenda 091918
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 4:05:54 PM
Creation date
11/13/2018 4:03:23 PM
Metadata
Fields
Template:
BOCC
Date
9/19/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OUTBoard minutes 091918
(Message)
Path:
\Advisory Boards and Commissions - Active\Orange Unified Transportation Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
169
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section4–CostAnalysis <br />CONCEPTUALDESIGN <br />Volkertrefinedtheroadwaynetworksbasedontheforecastfuturetrafficvolumes.Specificallyturnlanes <br />wereaddedatkeylocationswithhighturningvolumesandsignalswereassumedtobelocatedatareas <br />withhighcrossingandturningvolumes.Theconceptualdesigntookallenvironmentalfeaturesinto <br />considerationandoutlinedthelocationsofplannedroads,takingintoaccountwheretheplannedroads <br />wouldcrossthewatersources.Theroadsgenerallyavoidallenvironmentalfeatures.Theconceptual <br />designalsoincludesfrontageroadsasaccessmanagementoptions. <br />Mostoftheseroadsareintendedtoprovideaccesstotheareasofassumeddevelopment.Others,such <br />asnewroads,areplacedtoconnectexistingroadstootherexistingroadsinordertoprovidemore <br />connectionswithinthesystem.Inordertoaccommodatenewtrafficfromthepods,changestoexisting <br />roadswerealsoproposed. <br />CONSTRUCTIONCOSTESTIMATE <br />Usingtheconceptualanalysisdescribedabove,costestimatesweredevelopedforeachnewroadand <br />forroadwayimprovementstotheexistingroadways.Table2belowdetailsthecostforeachnewroadway <br />basedontherecommendedtypicalsection.Theoverallcostforconstructingtheapproximately11miles <br />ofroadwayis$30.9million. <br />Table2ͲConstructionCostEstimatesforNewRoads <br />NewRoadTypicalSectionSidewalkLength(mi)CostEstimate <br />A2DY1.52$4,351,189 <br />B2DY0.69$1,975,653 <br />C2DY1.16$3,321,323 <br />D2DY0.47$1,345,883 <br />E2DY0.37$1,059,139 <br />F12DY0.52$1,488,508 <br />F22AN1.28$3,520,000 <br />G2AN0.23$632,500 <br />H2AN3.99$10,972,500 <br />I2AN0.34$935,500 <br />J2AN0.18$495,000 <br />K2AN0.29$797,500 <br />Total11.04$30,894,260 <br />43 <br />102
The URL can be used to link to this page
Your browser does not support the video tag.