Browse
Search
OCPB agenda 100318
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2018
>
OCPB agenda 100318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 2:04:05 PM
Creation date
11/13/2018 3:34:48 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 100318
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5)US‐70/I‐85 Connector – US‐70 is a two‐lane road with a speed limit of 50 mph. I‐85 Connector is a <br />four‐lane divided highway with a speed limit of 55 mph. This current configuration operates at LOS <br />C. Poor connectivity led to an interchange reconfiguration project which did not score well enough <br />to receive funding in NCDOT’s prioritization process, and a more cost effective alternative was <br />requested. NCDOT Highway Division 7 has studied this intersection to determine whether a <br />roundabout or signalization would be more effective in the realignment of the intersection and <br />determined a roundabout would yield better results. With the realignment and added traffic for <br />2025, this intersection would operate at LOS D. <br />2016 <br /> 99
The URL can be used to link to this page
Your browser does not support the video tag.