Orange County NC Website
ORANGE COUNTY <br />PLANNING BOARD <br />ACTION AGENDA ITEM ABSTRACT <br /> Meeting Date: October 3, 2018 <br /> Action Agenda <br /> Item No. 7 <br /> <br />SUBJECT: Efland-Buckhorn-Mebane Access Management Plan Update <br /> <br />DEPARTMENT: Planning and Inspections <br /> <br /> <br />ATTACHMENT(S): INFORMATION CONTACT: <br />1. Planning Document Amendment Outline <br />Form – Efland-Buckhorn-Mebane <br />Access Management Plan <br />2. Draft Efland-Buckhorn-Mebane Access <br />Management Plan <br />Nishith Trivedi, Transportation Planner <br />(919) 245-2582 <br />Tom Altieri, Comprehensive Planning <br />Supervisor (919) 245-2579 <br />Craig Benedict, Planning Director <br />(919) 245-2585 <br /> <br />PURPOSE: To make a recommendation to the Board of County Commissioners (BOCC) on an <br />update to the Efland-Buckhorn-Mebane Access Management Plan (E-B-M AMP). <br /> <br />BACKGROUND: On April 3, 2018 the BOCC authorized the Planning Department to update <br />the adopted 2011 E-B-M AMP through the attached Amendment Outline Form (Attachment 1). <br />This update is conducted through a comprehensive public involvement process which includes <br />community input and recommendations from the Planning Board and Orange Unified <br />Transportation Board (OUTBoard) as outlined in the form. <br /> <br />The E-B-M AMP is: <br />• A combination of the original adopted 2011 E-B-M AMP, 2017 Transportation Study and <br />public comments. <br />• A long-range transportation vision for the area illustrating roadway alignment and corridor <br />width necessary to serve future land uses and address traffic impact as development occurs. <br />• A plan that assists the County in promoting economic development through its development <br />review process by encouraging developers to dedicate right-of-way necessary for future <br />roads. <br /> <br />The E-B-M AMP is not: <br />• A proposal for, nor does it seek authorization for, funding right-of-way acquisition. <br />• A collection of future road design and construction projects, nor does it include a schedule. <br />• A guarantee that future development will occur or that roads will be built. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> 13