Browse
Search
OCPB agenda 100318
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2018
>
OCPB agenda 100318
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 2:04:05 PM
Creation date
11/13/2018 3:34:48 PM
Metadata
Fields
Template:
BOCC
Date
10/3/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB minutes 100318
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
44 <br />Table 3 details the cost for upgrading the existing roadways described in this report. Bowman and Rock <br />Quarry Roads are already the recommended typical section and therefore the costs shown are for adding <br />sidewalk. The overall cost for upgrading these existing roadways is $13.6 million. <br />Table 3 ‐ Construction Cost Estimates for Updating Existing Roads <br />Widened Road Typical Section Sidewalk Length (mi) Cost <br />Ben Wilson Rd 3A Y 0.85 $1,672,794 <br />Bowman Rd 2D Y 1.42 $159,722 <br />W Ten Rd 3A Y 4.33 $8,505,230 <br />Rock Quarry Rd 2D Y 0.5 $56,372 <br />Buckhorn Rd 3A Y 1.10 $2,156,046 <br />Mt Willing Rd 3A Y 0.55 $1,078,023 <br />Total 8.75 $13,628,190 <br />Southern and Forest Roads, identified in the report, have no recommended improvements and are not <br />shown in either table. <br />Section 5 ‐ Conclusion <br />The primary purpose of this transportation report is to inform development of a roadway network to <br />support investment in the Efland‐Buckhorn‐Mebane Study Area. The new roadways identified in this <br />report have been located in such a way as to take into consideration environmental features and cultural <br />resources. Typical sections for both the new and existing roadways are recommended based on the <br />anticipated growth of the 18 development pods identified by Orange County. <br />Five key intersections were studied, forecasting future traffic volumes in the year 2025. Volkert was able <br />to refine the proposed roadway networks, specifically adding turn lanes at key locations. A Level of Service <br />(LOS) rating was calculated for each intersection. The total cost to provide the identified roadway network <br />and associated improvements to existing roads is approximately $44 million. <br /> 105
The URL can be used to link to this page
Your browser does not support the video tag.