Orange County NC Website
Section 4 – Cost Analysis  <br />CONCEPTUAL DESIGN  <br />Volkert refined the roadway networks based on the forecast future traffic volumes. Specifically turn lanes  <br />were added at key locations with high turning volumes and signals were assumed to be located at areas  <br />with high crossing and turning volumes. The conceptual design took all environmental features into  <br />consideration and outlined the locations of planned roads, taking into account where the planned roads  <br />would cross the water sources. The roads generally avoid all environmental features. The conceptual  <br />design also includes frontage roads as access management options.  <br />Most of these roads are intended to provide access to the areas of assumed development. Others, such  <br />as new roads, are placed to connect existing roads to other existing roads in order to provide more  <br />connections within the system. In order to accommodate new traffic from the pods, changes to existing  <br />roads were also proposed.  <br />CONSTRUCTION COST ESTIMATE  <br />Using the conceptual analysis described above, cost estimates were developed for each new road and  <br />for roadway improvements to the existing roadways. Table 2 below details the cost for each new roadway  <br />based on the recommended typical section. The overall cost for constructing the approximately 11 miles  <br />of roadway is $30.9 million.  <br />Table 2 ‐ Construction Cost Estimates for New Roads  <br />New Road Typical Section Sidewalk Length (mi) Cost Estimate  <br />A 2D Y 1.52 $4,351,189  <br />B 2D Y 0.69 $1,975,653  <br />C 2D Y 1.16 $3,321,323  <br />D 2D Y 0.47 $1,345,883  <br />E 2D Y 0.37 $1,059,139  <br />F1 2D Y 0.52 $1,488,508  <br />F2 2A N 1.28 $3,520,000  <br />G 2A N 0.23 $632,500  <br />H 2A N 3.99 $10,972,500  <br />I 2A N 0.34 $935,500  <br />J 2A N 0.18 $495,000  <br />K 2A N 0.29 $797,500  <br />Total 11.04 $30,894,260  <br /> 104