Browse
Search
OCPB agenda 090518
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Planning Board
>
Agendas
>
2018
>
OCPB agenda 090518
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2018 2:03:49 PM
Creation date
11/13/2018 3:31:09 PM
Metadata
Fields
Template:
BOCC
Date
9/5/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Document Relationships
OCPB Minutes 090518
(Attachment)
Path:
\Advisory Boards and Commissions - Active\Orange County Planning Board\Minutes\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
164
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orange County Concluding Process to Consider Land Use Plan Amendments to Expand <br />Hillsborough EDD: <br /> 2018 <br /> BOCC Information Item Sept. 4 <br /> Public Notification Mailed Sept. 14 <br /> Two-Part Public Outreach Meeting: Sept. 26 <br />1. “Planning 101” General Public Ed. Seminar <br />2. EDD Expansion Information <br /> Planning Board Recommendation Oct. 3 <br /> BOCC Public Hearing Nov. 1 <br /> <br />Planning Staff will provide subsequent notice to the BOCC with details of the Planning 101 <br />Public Education and EDD Expansion Information Meeting to be held September 26. It will <br />also seek assistance from the Orange County Department of Community Relations to help <br />notify the public of the Planning 101 portion of the meeting. Consistent with County <br />Ordinance, notification of the Public Information Meeting will be mailed to affected property <br />owners, as well as owners of property within 1000’ of the amendment area. <br /> <br />Review of Amendment Specifics: Maps identifying the amendment area and proposed land <br />use classifications are attached. Planning Staff is not recommending any rezoning at this <br />time. Currently, the area is zoned Rural Residential (R-1). Following are the definitions of <br />the applicable future land use classifications: <br /> <br />Joint* Land Use Plan Future Land Use Classification <br />“Suburban Office Complex” – These areas provide opportunities to for office and <br />employment enterprises which do not rely on walk-in customers or have a <br />manufacturing component. Businesses may be large or small but will generally <br />arrange themselves in a campus setting with limited walkability and supporting <br />services. Developments of this type should be kept small in nature to limit the peak <br />transportation impact and limited vitality. <br /> <br />Orange County Comprehensive Plan Future Land Use Classification <br />“Economic Development Transition Activity Node” - Land in areas of the County <br />which has been specifically targeted for economic development activity consisting of <br />light industrial, distribution, office, service/retail uses, and flex space (typically one- <br />story buildings designed, constructed, and marketed as suitable for use as offices <br />but able to accommodate other uses such as a warehouse, showroom, <br />manufacturing assembly, or similar operations.) Such areas are located adjacent to <br />interstate and major arterial highways, and subject to special design criteria and <br />performance standards. <br /> <br />*Approved by Hillsborough March 2018 <br /> <br /> 6
The URL can be used to link to this page
Your browser does not support the video tag.