Browse
Search
BOA agenda 111218 - cancelled
OrangeCountyNC
>
Advisory Boards and Commissions - Active
>
Orange County Board of Adjustment
>
Agendas
>
2018
>
BOA agenda 111218 - cancelled
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/13/2018 3:11:20 PM
Creation date
11/13/2018 2:51:34 PM
Metadata
Fields
Template:
BOCC
Date
11/12/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
391
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5 <br />Table 3: Weekly and Average Daily Wastewater Production in Order of Weekly Volume <br />Production <br />Order of Largest <br />to Smallest <br />Weekly Volume <br />Weekly Volume in <br />Descending Order <br />Average Daily <br />Volume in <br />Descending Order <br />Summer Camp <br />Week? <br />1 10170 1453 Yes <br />2 9859 1408 Yes <br />3 8016 1145 Yes <br />4 7797 1114 Yes <br />5 6308 901 Yes <br />6 5993 856 Yes <br />7 5723 818 No <br />8 5692 813 Yes <br />9 5194 742 Yes <br />10 5062 723 No <br />11 4969 710 No <br />12 4811 687 Yes <br />13 3294 471 Yes <br />14 3095 442 Yes <br />15 2532 362 No <br />16 1993 285 No <br />17 1716 245 No <br />18 1652 236 No <br />19 1606 229 No <br />20 892 127 No <br />21 0 0 No <br />**Summer camp weeks highlighted in green.** <br /> <br />A proposed two bedroom pastoral retreat has been proposed to connect to the sand <br />filter LPP system. With two bedrooms, this new structure will have a design sewage <br />flowrate of 240 gpd per 15A NCAC 18A .1949 (a). Accordingly, the design sewage <br />flowrate for the proposed pastoral retreat will reduce residual available capacity in the <br />sand filter LPP system, once connected. <br /> <br />Other Septic Systems <br />Usage data was not provided for other septic systems on the property; hence, we are <br />unable to assess available capacity in any septic system other than the sand filter LPP <br />system at this time. A similar pumped volume analysis could be utilized to assess <br />available capacity in the staff residence (Falcon), but installation of water meters would <br />be required for accurate assessment of all other systems due to their gravity dose <br />designs. <br /> <br /> <br />V. Summary <br /> <br />The sand filter LPP system currently has residual available capacity of 666 gpd, and this <br />available capacity could be significantly increased (possibly up to 1,397 gpd) with the <br />addition of FE technologies. Further, additional residual capacity may be available in <br />other existing septic systems on the property, but detailed analysis of these systems is <br />required for accurate assessment. <br /> <br />94
The URL can be used to link to this page
Your browser does not support the video tag.