Orange County NC Website
dMRY 1 SERVTCE <br /> Jesse Duclau <br /> In response to your need to have the rock areas near the residences on <br /> Tallyho Trail blasted, I amended the original quote to $120.00/cy for that area. <br /> The reason for the increase from the original prices can easily be explained. When <br /> a project bids, we look at the overall exposure and take into account the higher <br /> risk/less productive areas versus the higher production areas that we will have to <br /> blast. We spread our cost and ability to generate revenue over the entire project <br /> to determine standard cubic yard pricing for the project. The fact that it was <br /> decided that much of the rock should be excavated through other processes, thus <br /> leaving the higher risk/less productive areas to be blasted greatly changes the <br /> scope of our work from the original plans. <br /> As I stated, I have recalculated the pricing for the area near Tallyho Trail as shown <br /> on the revised quote, but I will leave the original prices in effect for the rock near <br /> the lay down yard. <br /> I believe you will agree, the scope of work has changed for NQS as well as Moffat <br /> Pipe. <br /> Please-I me know i you have any questions. <br /> f .F 1 <br /> f�eith- Isw" n 1� <br /> r i <br /> Mailing:P.O.Box 886 Physical:6216 Clementine Rd, u Clemmons,NC 27012 <br /> www.nationalquarryservice.com <br /> Toll Free: 1-877-747-ROCK <br />