Browse
Search
2018-720 Planning - Moffat Pipe amendment 6
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-720 Planning - Moffat Pipe amendment 6
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2019 11:29:48 AM
Creation date
11/9/2018 10:59:12 AM
Metadata
Fields
Template:
Contract
Date
10/23/2018
Contract Starting Date
7/10/2017
Contract Ending Date
2/28/2019
Contract Document Type
Contract Amendment
Amount
$93,271.08
Document Relationships
2018-085 Planning - Moffat Pipe Rogers Road sewer expansion change order 2
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-116 Planning - Moffat Pipe Change Order #3
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-535 Planning - Moffat Pipe change order 4
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2018-612 Planning - Moffat Pipe change order 5
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2018
2019-173 Planning - Moffat Pipe change order 8
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
2019-352 Planning - Moffat Pipe change order 5
(Message)
Path:
\Board of County Commissioners\Contracts and Agreements\General Contracts and Agreements\2010's\2019
R 2018-720 Planning - Moffat Pipe amendment 6
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE ORDER NO.: 6 <br /> Page 2 of 4 <br /> services, appurtenances, and all other items for a complete system as shown on the <br /> Drawings. <br /> b. Payment for this item will include,but not be limited to: <br /> 1) Drilling, blasting, monitoring, excavating and removing rock materials, loading, <br /> hauling,properly disposing of rock material. <br /> 2. Basis of Payment: <br /> a. The Contractor will be paid for the accepted rock removal on a cubic yardage basis,at the <br /> applicable Contract prices as listed in the itemized proposal, only for those cubic yards <br /> that do not meet the reasonable production rate of rock removal. <br /> b. Payment for this item will be made in concurrence with payment under Item 22 and not <br /> in lieu of. <br /> c. For new piping measure along the centerline of the trench, times the depth from the top <br /> of rock profile to the specified depth below the pipe,times the width of the trench. <br /> d. For manholes and structures, measure two feet beyond the outside of the structure <br /> (excluding extended base)times the depth of the structure plus one foot. <br /> Take measurements in the presence of the Owner's Representative or Engineer when possible. <br /> Maintain daily log sheets of measured quantities, and duration of excavation activities. Log <br /> sheets must be signed by the Owner's Representative or Engineer and submitted with payment <br /> request.Payment shall not be made for quantities that have not been field verified by the Owner's <br /> Representative or Engineer. <br /> FF.Item 45—Additional Pre-Blast Surveys <br /> 1. Work Included: <br /> a. Under this Item, the Contractor shall furnish the additional required pre-blast surveys as <br /> required by Section 31 23 16, Trenching for Utilities, Article 3.08.13.10 of the Contract <br /> Documents to complete blasting. Please note that the blasting radius has been changed <br /> from the specified 250 feet in the contract documents to 500 feet per the request of Town <br /> of Carrboro Fire Department. <br /> 2. Basis of Payment: <br /> a. The Contractor will be paid for the number of completed and accepted pre-blast surveys <br /> that fall within the extended 500 foot blast radius and were not covered under the original <br /> 250 foot blast radius." <br /> Moffat is also requesting an additional 22 calendar days to account for weather and production delays in <br /> the project considered to be no fault of their own and beyond their control.A breakdown of the delay days <br /> can be found in the Attachments. <br />
The URL can be used to link to this page
Your browser does not support the video tag.