Orange County NC Website
Moffat Pipe,Inc. <br /> �MoffatPipe.lns. Change Order Request 4901 Unicon Drive <br /> AwBUOSEC-perm Wake Forest,NC 27587 <br /> Ph.(919)295-4630 <br /> Fax(919)295.4631 <br /> To: AECOM of NC Change Order Request No:6 <br /> Attn: Krista Paredes-Toledo PE Date:10/11/18 <br /> Address: 1600 Perimeter Park Dr.Suite400 MPI Job No: 1203-17 <br /> Morrisville,NC 27560 Period Covered:6/1/18-9/30/18 <br /> Job Name:Historic Rogers Rd.Sewer Expansion <br /> CC: MPI Project Staff Description:Alternative Rock Removal <br /> Item Description*Preblast surveys Qty Unit Material Labor Equipment Subcontractor Total Cost <br /> Cos UUnll Total MH/Unit H,.Etl Rate Total Hrs Rate Total Hrs Rate Total <br /> MATERIALS <br /> $0. <br /> Soo( <br /> LABOR <br /> Superintendent EA 0 $59.29 $0.00 1 1 $0. <br /> Foreman EA 0 $45.17 $0.00 $0. <br /> Operator EA 0 $29.78 $0.001 $0• <br /> Laborer EA 0 $24.53 so 001 5o_oc <br /> EQUIPMENT <br /> 100,000 9 Excavator 450 EA $98.41 50.00 $0. <br /> 80,000#Excavator 350 EA $158'36 $0'00 $O.DC <br /> Large Hammer EA $82.23 $0.00 $0. <br /> Rock Grinder EA $33.50 $0.00 $0. <br /> 3.5 CY Loader EA $71.07 $0.00 $0. <br /> 1oxl0MHBox EA $18'88 $0'00 $0. <br /> 24x8x6 Trench Box EA $12.06 $0.00 $0. <br /> 24x4x6 Trench Box Slacker EA $8.50 $0.00 $0. <br /> Rock/Stone Box EA $12.64 $0.00 $0. <br /> 20KW Gen erator EA $18.98 $0.00 $0• <br /> Sweeper EA $24.52 $0.00 $0. <br /> Ford F-350(Superintendent) EA $20.29 $0.00 $0. <br /> Ford F-450(Foreman Service Truck) EA $27'28 $0'00 $0. <br /> Small Tools EA $30.00 $0.00 $0. <br /> Office Container FA $250 $000 $0 <br /> SUBCONTRACTOR <br /> Nabonal Quarry Service 15 FA $275.00 $4,125.00 $4,125. <br /> $0. <br /> Materials Labor Equipment Sub <br /> Subtotals $o.00 $0.00 $o.00 $4,125000 $41125. <br /> 7.5_%Sales T $0. <br /> 15%Mark Upon Materials $O.oc <br /> 15%Mark Up on Labor and Equp $D. <br /> 5%Mark Up on Subcontracto $2062 <br /> Bond Rat $64.9-1 <br /> Total Cost <br />