Orange County NC Website
CHANGE ORDER NO.: 6 <br /> Page 1 of 4 <br /> CHANGE ORDER <br /> CHANGE ORDER NO.: 6 DATE: October 23,2018 <br /> Project: Historic Rogers Road Sewer Expansion Project <br /> Contractor: Moffat Pipe,Inc. <br /> Engineer/Architect: URS Corporation—North Carolina <br /> CONTRACTOR is directed to make the following changes in the Contract Documents. <br /> Description:Add the following line items 42,43,44,and 45 to Section 00 4144,Unit Price Contract Bid <br /> Form. <br /> Please note that item numbers 42 and 43 represent the agreed upon price for the rock removal in June <br /> 2018. The backup documentation for the lump sum price can be found in the attached Moffat <br /> documentation for full crew costs and partial crew costs and days worked. <br /> Item Bid Description Units Estimated Unit Price Extended <br /> No. Quantity Total <br /> 42 12"P-401 DIP Lump Sum 1 $29,892.25 $29,892.25 <br /> w/Alternative Rock <br /> Removal(Full Crew)— <br /> June (24 hrs) <br /> 43 12"P-401 DIP Lump Sum 1 $155158.23 $15,15 8.23 <br /> w/Alternative Rock <br /> Removal(Partial Crew)— <br /> June(33.5 hrs) <br /> 44 High Risk Dense Rock Cubic 463.75 $94.50 $43,824.38 <br /> Removal(NIH A7-A11- Yards <br /> BI) <br /> 45 Additional Pre-blast Each 15 $293.08 $45396.22 <br /> Surveys(Phase 2 <br /> Blasting) <br /> Net Adjustment of this Change Order $93,271.08 <br /> • The following shall be added to Section 0122 00,Unit Prices,Article 1.06: <br /> "EE.Item 44—High Risk Dense Rock Removal <br /> 1. Work Included: <br /> a. Under this Item, the Contractor shall furnish all material, labor, and equipment for rock <br /> removal between SSMH-A7 and SSMH-All and SSMH-Bl. This shall be by either <br /> mechanical or explosive methods,to properly install the sanitary sewer piping,manholes, <br />