Browse
Search
2018-728-E AMS - Sportsplex Boiler Replacement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-728-E AMS - Sportsplex Boiler Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 11:56:39 AM
Creation date
11/8/2018 4:44:39 PM
Metadata
Fields
Template:
Contract
Date
10/24/2018
Contract Starting Date
10/24/2018
Contract Ending Date
12/31/2018
Contract Document Type
Agreement - Services
Amount
$67,400.00
Document Relationships
R 2018-728 AMS - Sportsplex Boiler Replacement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID:6B7A77DD-54E7-4F47-B9AO-DD965DOE64AD <br /> d 'e M 0*W&S t <br /> �E_ <br /> Commercial Industrial H-VAC <br /> 5012 Neal Road,Durham,NC 27705 <br /> Service: 919-680-6400, Office: 919-382-3330,Fax: 919-382-3332 <br /> Orange County Sportsplex September 28,2018 <br /> REVISED October 2,2018 <br /> Attn: Mr. John Stock <br /> Re: Bailer Replacement <br /> Scope: Existing fin-tube boiler has defective heat exchanger&is un-operative <br /> Existing boiler used for Building heating,dehumidifier re-heat, restrooms, lockers & <br /> kids pool <br /> Exiting Boiler is atmospheric,requiring a huge volume of air for combustion&rated apx <br /> 80% efficiency <br /> Winter operation is problematic due to large volume of combustion air entering boiler <br /> roam via door louvers <br /> We Propose To: <br /> Option 1)Replace with Like <br /> Disconnect utilities, Controls, Piping&flue stack <br /> Remove &dispose of one (1)existing Raypak boiler <br /> Provide& Install new boiler with same Make& capacity,Raypak 3,000,000 BTU <br /> Reconnect piping, Controls, & electrical <br /> Re-insulate piping connections <br /> Re-install existing flue stack <br /> Start-up&commission <br /> Build schedule 4-5 weeks from release <br /> We will provide labor(during normal business hours) Equipment and material listed <br /> above,Receive 1 Store 1 deliver, Rigging, Mechanical I electrical permitting, one year <br /> parts&labor warranty, O&M Manuals at completion for above <br /> Option# 1 For The Sum Of +++++++++++++++++++++++F+ ($39,920.00 <br /> Option#2 High Efficiency Boiler <br /> Disconnect utilities, Controls,Piping &remove f dispose of complete flue stack <br /> Remove &dispose of one(1) existing Raypak boiler <br /> Provide& install One(1)Weil-McLain Slim-fit Condensing Boiler rated 2,000,000 <br /> BTU 96% + efficiency <br /> 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.