Browse
Search
2018-727-E AMS - CSR LLC PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-727-E AMS - CSR LLC PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 11:54:20 AM
Creation date
11/8/2018 4:44:27 PM
Metadata
Fields
Template:
Contract
Date
9/25/2018
Contract Starting Date
9/25/2018
Contract Ending Date
12/26/2018
Contract Document Type
Agreement - Construction
Agenda Item
5/15/18
Amount
$19,887.50
Document Relationships
Agenda - 05-15-2018 8-b - Fiscal Year 2017-18 Budget Amendment #9
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 05-15-2018 Regular Meeting
R 2018-727 AMS - CSR refrigerator LLC PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimate <br />Date <br />7/23/2018 <br />Estimate # <br />E2018-12 <br />Name / Address <br />Piedmont Food and Ag. <br />500 Valley Forge Rd. <br />Hillsborough, NC 27278 <br />919-241-4082 <br />CSR, LLC <br />P.O. Box 13377 <br />Research Triangle Park, NC 27709 <br />Project <br />Please call me with any questions. <br />Thanks, Brad Total <br />Description Qty Rate Total <br />When it arrives, CSR will receive it and verify it is the right <br />equipment and not damaged. <br />4.MECHANICAL WORK, SEE CSR ESTIMATE 2018-11 <br />Once we get started with the project, CSR will order the new <br />equipment. <br />While its being made/ shipped, the GC can get the concrete work <br />done to the specs needed for <br />this installation. (TBD) <br />Then the roof work gets done to allow for the holes in the exterior <br />wall to be cut and finished. <br />When were ready for the equipment CSR will install the new boxes <br />and have the electrician wire it all up. <br />The fire people will need to get sprinkler heads installed. <br />Then we install any alarm or sensors for the building systems. <br />5. PREVENTATIVE SERVICE <br />CSR offers a bi-annual preventative maintenance program. <br />We will come out twice a year and clean the condenser coils and <br />evaporator coils/ drains. We will verify the cooling and defrost <br />circuits are working as they should and dial in the temperatures with <br />a thermocouple for best accuracy. <br />Verify proper operation. <br />CSR will do this service for $200.00 per PM including all labor and <br />any chemicals needed to do the PM. <br />This PM is for maintenance of the 2 new walk in boxes. The PM <br />does not include repairs or warranty service for the equipment or <br />boxes. Repairs are additional. <br />6. CSR SERVICE RATES <br />For future work CSR has a service rate of $65.00 per hour per <br />mechanic with a 2 hour minimum charge for a service call, <br />($130.00). This is the labor rate and does not include any parts. <br />To address any additional miscellaneous services that may be <br />required, additional meetings with the client or regulatory agencies, <br />or other items beyond the scope of work in Items 1-5, meetings may <br />Page 2 <br />DocuSign Envelope ID: 82563161-0395-43B6-972A-055C2D70D933
The URL can be used to link to this page
Your browser does not support the video tag.