Browse
Search
2018-727-E AMS - CSR LLC PFAP freezer installation
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-727-E AMS - CSR LLC PFAP freezer installation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 11:54:20 AM
Creation date
11/8/2018 4:44:27 PM
Metadata
Fields
Template:
Contract
Date
9/25/2018
Contract Starting Date
9/25/2018
Contract Ending Date
12/26/2018
Contract Document Type
Agreement - Construction
Agenda Item
5/15/18
Amount
$19,887.50
Document Relationships
Agenda - 05-15-2018 8-b - Fiscal Year 2017-18 Budget Amendment #9
(Attachment)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 05-15-2018 Regular Meeting
R 2018-727 AMS - CSR refrigerator LLC PFAP freezer installation
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Estimate <br />Date <br />7/23/2018 <br />Estimate # <br />E2018-12 <br />Name / Address <br />Piedmont Food and Ag. <br />500 Valley Forge Rd. <br />Hillsborough, NC 27278 <br />919-241-4082 <br />CSR, LLC <br />P.O. Box 13377 <br />Research Triangle Park, NC 27709 <br />Project <br />Please call me with any questions. <br />Thanks, Brad Total <br />Description Qty Rate Total <br />Thank you for the opportunity to lay out and plan the project to be <br />done at Piedmont Food and Ag. in Hillsborough, NC. <br />CSR will provide the following for this project. <br />1. Design and layout of the project to get started. <br />2. Measurement and engineering specs pertaining to size and type of <br />equipment necessary for this project. <br />3. Ordering and receiving the equipment to assure it is correct and <br />free of damage prior to installation. <br />4. Mechanical portion of the installation of the new equipment. <br />5. Scheduled bi-annual or quarterly maintenance of the new <br />equipment when its up and running. <br />6. Service rates for future work. <br />1. DESIGN AND LAYOUT: <br />The project is to build 2 new 15ft. by 20ft. walk in freezers located <br />off the rear of the building near the loading dock. <br />Went through the building with Eric to see what would work best <br />for the needs of PFA. <br />We came up with 2 smaller boxes to make it easier to manage the <br />fluctuating product needs. <br />CSR recommendations: <br />Use single phase equipment for this application. <br />Covering the boxes with some type of roof. <br />Recess the new concrete that the boxes will sit on to make the floor <br />level from the loading dock into the new refrigerated boxes. <br />2. ENGINEERING SPECS DELIVERED: <br />The design temperature is -10F. The amount of cooling BTUs are <br />based on storage of frozen foods with warm food entering the <br />refrigerated boxes. <br />CSR will provide cooling BTU estimates to properly size the new <br />equipment. <br />3. ORDER/ RECEIVE EQUIPMENT: <br />Once the customer decides what they want to get, CSR will assist in <br />ordering the equipment. <br />3,500.003,500.00T <br />Page 1 <br />DocuSign Envelope ID: 82563161-0395-43B6-972A-055C2D70D933
The URL can be used to link to this page
Your browser does not support the video tag.