Browse
Search
Agenda - 11-13-2018 8-a - Minutes
OrangeCountyNC
>
Board of County Commissioners
>
BOCC Agendas
>
2010's
>
2018
>
Agenda - 11-13-2018 Regular Meeting
>
Agenda - 11-13-2018 8-a - Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2018 2:05:05 PM
Creation date
11/8/2018 2:06:21 PM
Metadata
Fields
Template:
BOCC
Date
11/13/2018
Meeting Type
Regular Meeting
Document Type
Agenda
Agenda Item
8-a
Document Relationships
Agenda - 11-13-2018 Regular Board Meeting
(Message)
Path:
\Board of County Commissioners\BOCC Agendas\2010's\2018\Agenda - 11-13-2018 Regular Meeting
Minutes 11-13-2018
(Message)
Path:
\Board of County Commissioners\Minutes - Approved\2010's\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
18 <br /> <br /> No dramatic land use changes 1 <br /> Primarily Shared-Use Path (SUP) east of Long Dairy Road, shown on north side 2 <br /> Primarily sidewalks (both sides) west of NC 119 3 <br /> 4 <br />5 graphs 5 <br /> 6 <br />Priorities 7 <br /> Safety, especially for bicyclists & pedestrians 8 <br />Both crossing & along NC 54 9 <br /> Intersection improvements (short-range) 10 <br /> Ultimate cross-sections (long-range) 11 <br /> Transit and other options 12 <br /> Supportive land uses & policies 13 <br /> Environmental protection & mitigation 14 <br /> Implementation phasing 15 <br /> 16 <br />Recommendations 17 <br /> 4 lanes will be needed throughout the corridor 18 <br /> Access management will be critical, especially along existing 5-lane section 19 <br /> Phasing is feasible (ends middle) 20 <br /> Most likely 23-foot raised grassed median with ditches east of NC 119 21 <br />• Potentially narrower median in limited locations 22 <br />• Curb-&-gutter appropriate in some locations 23 <br /> 24 <br />6 graphs 25 <br /> 26 <br />Implementation 27 <br /> 28 <br />Graph 29 <br /> 30 <br />Estimated Costs 31 <br />Total = $180 million 32 <br />Alamance County = $ 80 million 33 <br />Orange County = $100 million 34 <br />By Phase 35 <br />$43 million – Phase 1 Subtotal (Orange County) 36 <br />$48 million – Phase 2 Subtotal 37 <br />$24 million – Phase 2: Alamance County 38 <br />$24 million – Phase 2: Orange County 39 <br />$36 million – Phase 3 Subtotal (Alamance County) 40 <br />$53 million – Phase 4 Subtotal 41 <br />$20 million – Phase 4: Alamance County 42 <br />$33 million – Phase 4: Orange County 43 <br /> 44 <br />Carrboro Comments: 45 <br />Carrboro provided the following comments at its October 16 Meeting: 46 <br />• While Carrboro is skeptical about the recommended widening, it understands current 47 <br />operational and intersection improvements in the Town may help address some of the 48 <br />growing traffic and safety issues at this end of the study area. 49
The URL can be used to link to this page
Your browser does not support the video tag.