Browse
Search
2018-724-E AMS - Sportsplex Pool Boiler Replacement Agreement
OrangeCountyNC
>
Board of County Commissioners
>
Contracts and Agreements
>
General Contracts and Agreements
>
2010's
>
2018
>
2018-724-E AMS - Sportsplex Pool Boiler Replacement Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2018 11:46:23 AM
Creation date
11/6/2018 3:16:17 PM
Metadata
Fields
Template:
Contract
Date
10/23/2018
Contract Starting Date
10/23/2018
Contract Ending Date
12/31/2018
Contract Document Type
Agreement - Services
Amount
$29,900.00
Document Relationships
R 2018-724 AMS - Sportsplex Pool Boiler Replacement Agreement
(Attachment)
Path:
\Board of County Commissioners\Contracts and Agreements\Contract Routing Sheets\Routing Sheets\2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Option # 3) High efficiency boiler and heat exchanger <br />Replace existing Raypak hot water boiler with Weil-McLane <br />High efficiency boiler <br />Disconnect utilities, Controls, Piping & remove / dispose of complete flue stack <br />Remove & dispose of one (1) existing Raypak boiler <br />Provide & install One (1) Weil-McLain Slim-fit Condensing Boiler rated 500,000 BTU <br />Each & 96% efficiency <br />Provide & install 6” PVC combustion air inlet & Flue vent through existing roof <br />penetration <br />provide & install Stainless steel heat exchanger, fill valve, expansion tank & pump to <br />isolate boiler from pool <br />Re-work / Reconnect piping, Controls, & electrical <br />Re-insulate piping connections <br />Re-install existing flue stack <br />Start-up & commission <br />Build schedule 3-4 Days from release <br /> <br />We will provide labor (during normal business hours) Equipment and material listed <br />above, Receive / Store / deliver, Rigging, Mechanical / electrical permitting, one year <br />parts & labor warranty, O&M Manuals at completion for above <br /> <br />Option # 3 For the sum of +++++++++++++++++++++++++ ($29,900.00 <br /> <br />Option # 4) Comp Pool High efficiency boiler and heat exchanger <br />If Preformed with Option 3 above <br />Replace existing Raypak hot water boiler with Weil-McLane <br />High efficiency boiler <br />Disconnect utilities, Controls, Piping & remove / dispose of complete flue stack <br />Remove & dispose of one (1) existing Raypak boiler <br />Provide & install One (1) Weil-McLain Slim-fit Condensing Boiler rated 1,000,000 BTU <br />Each & 96% efficiency <br />Provide & install 8” PVC combustion air inlet & Flue vent through existing roof <br />penetration <br />provide & install Stainless steel heat exchanger, fill valve, expansion tank & pump to <br />isolate boiler from pool <br />Re-work / Reconnect piping, Controls, & electrical <br />Re-insulate piping connections <br />Re-install existing flue stack <br />Start-up & commission <br />Build schedule 3-4 Days from release <br /> <br />We will provide labor (during normal business hours) Equipment and material listed <br />above, Receive / Store / deliver, Rigging, Mechanical / electrical permitting, one year <br />parts & labor warranty, O&M Manuals at completion for above <br /> <br /> 2 of 3 <br />DocuSign Envelope ID: 34AD1798-2E56-4E73-A597-DE5864ACFB32
The URL can be used to link to this page
Your browser does not support the video tag.